Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Apply Date:
09/19/2016
Applicant:
EVERNHAM, KEVIN TODD (TRAVIS MUILENBURG)
Description:
FUP- T16CM07171
Architects:
  • EVERNHAM, KEVIN TODD

Permit Reviews

Permit Number - T16OT01150
Permit Status: Final
Permit Description: FUP- T16CM07171
Start Date Submittal Complete Date Status  
09/19/2016 PLANS OK TO SUBMIT - FLOODPLAIN 09/19/2016 COMPLETED Review Details
09/19/2016 FLOODPLAIN 10/21/2016 COMPLETED Review Details
10/21/2016 FLOODPLAIN 10/21/2016 ACTIVE Review Details

Outstanding Activity Conditions

Permit Number - T16OT01150
Permit Status: Final
Permit Description: FUP- T16CM07171
Total Outstanding Activity Conditions - 1
Date Name
10/21/2016 October 21, 2016 (No Elevation Certificate Required) The applicant is authorized to use a portion of the flood hazard area (FEMA Zone X, Panel 2281, City Of Tucson Flood Hazard Area) in the City of Tucson at 3856 East Speedway Boulevard (SPEEDWAY VIEW PTN E91.67' LOT 2 & PTN LOT 3 LYG S & W OF ST BLK 1) for the purpose of making improvements to an existing commercial building and associated site improvements. The applicant agrees to comply with City of Tucson Floodplain and Erosion Hazard regulations, and is particularly bound by the conditions stated below. Violation of any of the conditions stated or referred to below, as determined by the City Engineer, shall be grounds for revocation of this permit. Responsibility for renewal of this permit, if necessary, is with the applicant. Issuance of this permit does not constitute a waiver of other requirements contained in the Tucson City Code, Land Use Code, or any other Federal, State, or local regulation. No use other than as permitted herein is allowed. Additional uses allowed under City of Tucson Floodplain and Erosion Hazard Regulations and Watercourse Amenities, Safety, and Habitat regulations require the issuance of an additional Floodplain Use Permit. The following conditions shall apply to this permit. 1) This permit becomes invalid and is subject to additional floodplain review, if any required development changes the construction of the building or site improvements, or, if there is any further disturbance within the floodplain other than that outlined in this application. This floodplain use permit may be subject to conditions or restrictions designed to reduce or mitigate the potential damage or hazard to life or property resulting from new building and site improvements within the regulatory floodplain, floodway or erosion hazard areas as determined by the project engineer and accepted by the City of Tucson. 2) All work shall conform to the attached plans (T16CM07171 and associated plans) which are made part of this permit. 3) This structure is a conforming structure based on certification of the lowest floor by Mark Machen RLS 16294, dated October 3, 2016. The lowest floor of the structure will not be lowered by this project. 4) Except as approved by the City Engineer prior to the start of construction, development under this permit shall not obstruct, retard or divert the existing flow of floodwaters from or to adjacent properties. 5) Any additional future disturbance of the floodplain including the construction of any fences, walls or accessory structures shall have separate floodplain use permit applications submitted to this office for review and approval.

Documents

File Name Document Type  
None DOCUMENTS VIEW