Permit Details

Status:
Final
Type:
RIGHT OF WAY IMPROVMENTS
Apply Date:
04/11/2016
Applicant:
SLETTEN CONSTRUCTION COMPANY ,
Description:
REMOVE AND REPLACE HANDI-CAP RAMPS ON KOLB RD. DP14-0018 100 LF Remove and replace curb access ramp on the south side of the driveway entrance on Kolb Rd. Contractor must provide ADA compliant pedestrian access through/around work site per MUTCD Part 6D.

Completed Inspections

Permit Status: Final
Permit Number: T16EX01225
Permit Description: REMOVE AND REPLACE HANDI-CAP RAMPS ON KOLB RD. DP14-0018 100 LF Remove and replace curb access ramp on the south side of the driveway entrance on Kolb Rd. Contractor must provide ADA compliant pedestrian access through/around work site per MUTCD Part 6D.
Total Completed Inspections - 1
Date Description Inspector Results Comments
09/09/2016 TDOT-EXCAV GENERAL INSPECTION Bravin Approved New walmart on speedway and Kolb. All new ramps and sidewalk meet ADAs. Some issues with asphalt crosslope, but contractor redid the repairs three times until it was right. Walmart recieved there Cof O and complied with repair request. No issues

Documents

File Name Document Type  
T16EX01225.PDF EXCAVATION VIEW