Permit Details

Status:
Final
Type:
OTHER REPAIRS
Address NEW:
409 E DISTRICT ST
Apply Date:
03/29/2016
Applicant:
K E & G CONSTRUCTION ***APA***
Description:
Excavation and removal of 5 LF of 8" VCP sewer piping between MH 5932-18 and 5932-17. Trenching should be approximately 5' X 4' X 6'. Soft roadway closure will be during the daytime. All removed asphalt will be replaced to match existing.
Contractors:
  • K E AND G CONSTRUCTION INC

Completed Inspections

Permit Status: Final
Permit Number: T16EX01057
Permit Description: Excavation and removal of 5 LF of 8" VCP sewer piping between MH 5932-18 and 5932-17. Trenching should be approximately 5' X 4' X 6'. Soft roadway closure will be during the daytime. All removed asphalt will be replaced to match existing.
Total Completed Inspections - 1
Date Description Inspector Results Comments
04/29/2016 TDOT-EXCAV GENERAL INSPECTION JC Approved All work as been completed in area,no concerns.

Documents

File Name Document Type  
T16EX01057.PDF EXCAVATION VIEW