Permit Details

Status:
Final
Type:
COMMERCIAL ADDITION
Apply Date:
02/10/2016
Applicant:
FRANK RENDON
Description:
T.I;ENCLOSE WALKWAY AND REMODEL W.ADDITION
Contractors:
  • INSIGHT PAINTING & CONTRACTING LLC

Permit Reviews

Permit Number - T16CM00963
Permit Status: Final
Permit Description: T.I;ENCLOSE WALKWAY AND REMODEL W.ADDITION
Start Date Submittal Complete Date Status  
02/10/2016 COMMERCIAL - TI 09/14/2016 COMPLETED Review Details
09/14/2016 COMMERCIAL - TI 09/15/2016 COMPLETED Review Details
10/05/2016 REVISION - - 1ST 10/05/2016 ACTIVE Review Details

Outstanding Activity Conditions

Permit Number - T16CM00963
Permit Status: Final
Permit Description: T.I;ENCLOSE WALKWAY AND REMODEL W.ADDITION
Total Outstanding Activity Conditions - 1
Date Name
02/10/2016 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T16CM00963
Permit Description: T.I;ENCLOSE WALKWAY AND REMODEL W.ADDITION
Total Completed Inspections - 23
Date Description Inspector Results Comments
10/05/2016 BUILDING PRE-SLAB BRUCE_S Approved
10/05/2016 EXCAVATION/LAYOUT REBAR & ZON BRUCE_S Approved
10/25/2016 PLUMBING - ROUGH, SOIL BSTEVENS Approved
10/25/2016 PLUMBING - INTERMEDIATE BSTEVENS Approved
11/18/2016 MECHANICAL - ABOVE CEILING BSTEVENS Approved
11/18/2016 MECHANICAL - INTERMEDIATE BSTEVENS Approved
11/18/2016 PLUMBING - ABOVE CEILING BSTEVENS Approved
11/18/2016 BUILDING ABOVE CEILING BSTEVENS Approved
11/18/2016 FRAMING BSTEVENS Approved
11/18/2016 ELECTRIC - ABOVE CEILING BSTEVENS Approved
11/18/2016 ELECTRIC - INTERMEDIATE BSTEVENS Approved
11/29/2016 SHEET ROCK NAILING BSTEVENS Approved
12/22/2016 FIRE - FINAL CBASALDUA Approved
12/23/2016 MECHANICAL - FINAL BSTEVENS Approved
12/23/2016 PLUMBING - FINAL BSTEVENS Approved
12/23/2016 PLUMBING - PROGRESS BSTEVENS Approved
12/23/2016 BUILDING - PROGRESS BSTEVENS Approved
12/23/2016 BUILDING - FINAL BSTEVENS Approved
12/23/2016 ELECTRIC - FINAL BSTEVENS Approved
12/23/2016 PLUMBING - FINAL BSTEVENS Approved FLEX TAILPIECE AT LAVATORY NOT APPROVED FITTING.
DISHWAHSER DRAIN MUST LOOP UP.
CAP OPENING IN PANEL DEAD FRONT
COVER JUNCTION BOX
12/23/2016 BUILDING - FINAL BSTEVENS Approved FLEX TAILPIECE AT LAVATORY NOT APPROVED FITTING.
DISHWAHSER DRAIN MUST LOOP UP.
CAP OPENING IN PANEL DEAD FRONT
COVER JUNCTION BOX
12/23/2016 ELECTRIC - FINAL BSTEVENS Approved FLEX TAILPIECE AT LAVATORY NOT APPROVED FITTING.
DISHWAHSER DRAIN MUST LOOP UP.
CAP OPENING IN PANEL DEAD FRONT
COVER JUNCTION BOX
12/23/2016 ENGINEERING - FINAL MRUSSO Approved

Documents

File Name Document Type  
001_T.1.TIF CONSTRPLANS VIEW
002_C.1.TIF CONSTRPLANS VIEW
003_A1.TIF CONSTRPLANS VIEW
004_A1.1.TIF CONSTRPLANS VIEW
005_S1.TIF CONSTRPLANS VIEW
006_MPE1.TIF CONSTRPLANS VIEW
None DOCUMENTS VIEW