Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
SINGLE FAMILY NEW
Apply Date:
01/21/2016
Applicant:
JOHN YBARRA
Description:
SFR MODEL22016 T16-M0013
Contractors:
  • C A DEVELOPMENT AND CONSTRUCTION L L C

Permit Reviews

Permit Number - T16CM00501
Permit Status: Final
Permit Description: SFR MODEL22016 T16-M0013
Start Date Submittal Complete Date Status  
01/21/2016 RESIDENTIAL - BLDG-MODEL PLAN/ENGINE/WALK THRU 01/27/2016 COMPLETED Review Details
04/26/2016 REVISION - - 1ST 06/20/2016 COMPLETED Review Details
06/23/2016 REVISION - - 2ND 06/24/2016 ACTIVE Review Details

Outstanding Activity Conditions

Permit Number - T16CM00501
Permit Status: Final
Permit Description: SFR MODEL22016 T16-M0013
Total Outstanding Activity Conditions - 1
Date Name
01/21/2016 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T16CM00501
Permit Description: SFR MODEL22016 T16-M0013
Total Completed Inspections - 24
Date Description Inspector Results Comments
03/01/2016 ELECTRIC - UFER JBURGE Approved IVRS - Inspection :*
03/01/2016 EXCAVATION/LAYOUT REBAR & ZON JBURGE Approved IVRS - Inspection :*
03/04/2016 STEM WALL/RETAINING WALL JBURGE Approved IVRS - Inspection :*
03/08/2016 PLUMBING - ROUGH, SOIL JBURGE Approved IVRS - Inspection :*
03/10/2016 BUILDING PRE-SLAB JBURGE Approved IVRS - Inspection :*
03/21/2016 REINFORCED MASONRY PRE-GROUT MPUGH1 Approved IVRS - Inspection :*
03/31/2016 ROOF NAILING aquiroz Approved
04/27/2016 PLUMBING - INTERMEDIATE INGRAM Approved
04/27/2016 ELECTRIC - INTERMEDIATE INGRAM Approved
04/27/2016 FRAMING INGRAM Approved
04/29/2016 PLUMBING - GAS PRESSURE TEST JBURGE Approved
04/29/2016 ELECTRIC - CABLE DROP JBURGE Approved
04/29/2016 ELECTRIC - CONSTRUCTION POWER JBURGE Approved
04/29/2016 U VALUE FOR WINDOW JBURGE Approved
05/04/2016 PLUMBING - SEWER HCS CONNECT INGRAM Approved
05/11/2016 PLUMBING - YARD WTR LINE/TEST INGRAM Approved OUTSIDE LINES PASS.
07/15/2016 BUILDING - FINAL BSTEVENS Approved
07/15/2016 ELECTRIC - UNDERGROUND BSTEVENS Approved
07/15/2016 ELECTRIC - FINAL BSTEVENS Approved
07/15/2016 OUTDOOR LIGHTING FINAL BSTEVENS Approved
07/15/2016 PLUMBING - FINAL BSTEVENS Approved
07/15/2016 MECHANICAL - INTERMEDIATE BSTEVENS Approved
07/15/2016 MECHANICAL - FINAL BSTEVENS Approved
08/30/2016 ZONING - FINAL RLEDONNE Approved REPAIR CROSS SLOPES ON SIDE WALKS.

Documents

File Name Document Type  
001_C1.0.TIF CONSTRPLANS VIEW
001_SHEET 5 OF 6.TIF CONSTRPLANS VIEW
None DOCUMENTS VIEW