Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T15TC01757
Permit Details
Apply Date:
07/27/2015
Applicant:
SPRINT COMMUNICATIONS COMPANY L.P.
Description:
INSTALL CONDUIT AND FIBER OPTIC MINIMUN 48" DEPTH, MINIMUN DEPTH THROUGH WATER WAYS, 10' DEPTH AS GOVERNING AUTHORITY, 2" HDPE, BORE METHOLD, 5566 LINEAR FEET; 1-5'X7'X6' MANHOLE; 2-30"X60"X18" VAULT. NO EXCAVATION WITHIN GRANT ROADWAY. ALL CONSTRUCTION WIL BE PERFORMED NORTH OF NORTH CURB LINE. AERIAL CONSTRUCTION BEGINS AT EAST END OF GRANT, PRIOR TO EAST BOUND 1-10 FRONTAGE RD TO SILVERBELL RD. IS THE ONLY MAJOR AERIAL ROADWAY INVOLVED IN THIS CONSTRUCTION.
Contractors:
- RUTHERFORD DIVERSIFIED INDUSTRIES
Completed Inspections
Permit Status: Final
Permit Number: T15TC01757
Permit Description: INSTALL CONDUIT AND FIBER OPTIC MINIMUN 48" DEPTH, MINIMUN DEPTH THROUGH WATER WAYS, 10' DEPTH AS GOVERNING AUTHORITY, 2" HDPE, BORE METHOLD, 5566 LINEAR FEET; 1-5'X7'X6' MANHOLE; 2-30"X60"X18" VAULT. NO EXCAVATION WITHIN GRANT ROADWAY. ALL CONSTRUCTION WIL BE PERFORMED NORTH OF NORTH CURB LINE. AERIAL CONSTRUCTION BEGINS AT EAST END OF GRANT, PRIOR TO EAST BOUND 1-10 FRONTAGE RD TO SILVERBELL RD. IS THE ONLY MAJOR AERIAL ROADWAY INVOLVED IN THIS CONSTRUCTION.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2015 | TDOT-Routine Barricade Inspect | BMONG | Approved |