Permit: T15TC01399
Permit Details
Apply Date:
06/04/2015
Applicant:
COX COMMUNICATIONS**B
Description:
Starting from Cox ped on the S/side of Valencia Rd and west of Tucson Blvd, trench north 15ft dirt and pothole 3'x3'x3' for boring street north 120ft. Trench turns west 75ft dirt, hand dig N/W under sidewalk 5ft and trench 7ft dirt. Trench continues west 23ft dirt, pothole 3'x3'x3' to bore driveway west 30ft. Trench continues west 13ft dirt and Cox ped installed. Trench continues north out of ROW.
Contractors:
- ALPHA UNDERGROUND CONSTRUCTION CO INC *APA
Outstanding Activity Conditions
Permit Number - T15TC01399
Permit Status: Final
Permit Description: Starting from Cox ped on the S/side of Valencia Rd and west of Tucson Blvd, trench north 15ft dirt and pothole 3'x3'x3' for boring street north 120ft. Trench turns west 75ft dirt, hand dig N/W under sidewalk 5ft and trench 7ft dirt. Trench continues west 23ft dirt, pothole 3'x3'x3' to bore driveway west 30ft. Trench continues west 13ft dirt and Cox ped installed. Trench continues north out of ROW.
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 06/05/2015 | Please see notations on traffic plan. Changes are required for the facilitation of this traffic plan. |
Completed Inspections
Permit Status: Final
Permit Number: T15TC01399
Permit Description: Starting from Cox ped on the S/side of Valencia Rd and west of Tucson Blvd, trench north 15ft dirt and pothole 3'x3'x3' for boring street north 120ft. Trench turns west 75ft dirt, hand dig N/W under sidewalk 5ft and trench 7ft dirt. Trench continues west 23ft dirt, pothole 3'x3'x3' to bore driveway west 30ft. Trench continues west 13ft dirt and Cox ped installed. Trench continues north out of ROW.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/10/2015 | TDOT-Routine Barricade Inspect | bmong | Approved |