Permit Details

Status:
Final
Type:
Complete Closure
Address:
1060 E GRANT RD
Apply Date:
01/26/2015
Applicant:
SOUTHWEST GAS B*
Description:
(2) 5X5 IN DIRT IN ALLEY IN REAR OF PROPERTY TO RELOCATE GAS LINE ALLEY REQUEST IS FOR 01/23/15 ONLY
Contractors:
  • ARIZONA PIPE LINE COMPANY ,
  • NPL CONSTRUCTION CO

Outstanding Activity Conditions

Permit Number - T15TC00272
Permit Status: Final
Permit Description: (2) 5X5 IN DIRT IN ALLEY IN REAR OF PROPERTY TO RELOCATE GAS LINE ALLEY REQUEST IS FOR 01/23/15 ONLY
Total Outstanding Activity Conditions - 23
Date Name
01/26/2015 This plan represents a concept only and is subject to field review.
01/26/2015 Keep a copy of your approved traffic control plan at the work site at all times.
01/26/2015 The distance shown on the plans are approximate and subject to adjustments in the field.
01/26/2015 Category I and Category II work zone traffic control devices shall meet NCHRP Report 350 test and evaluation criteria.
01/26/2015 At the end of each day, clean the roadway of excess dirt and debris.
01/26/2015 Notify in writing at least 48 hours before work begins, any businesses, residences and public transit routes affected by your temporary traffic control.
01/26/2015 Notify City Communications (791-4144) at least 24 hours prior to closing any street or alley completely.
01/26/2015 Requires the use of an arrow board for lane closures on collector and arterial streets.
01/26/2015 Mark all unattended traffic and pedestrian hazards, including dumpster and mobile storage units, with type II barricades equipped with type A flashers. .
01/26/2015 Where it is relevant, equip all working and regulatory signs with highly visible flags and clean lights.
01/26/2015 Place sandbags at the base of your signs and barricades to prevent them from being knocked over by traffic.
01/26/2015 Notify Environmental Services (791-3175) at least 24 hours prior to closing any street or alley completely.
01/26/2015 Notify SunTran (623-4301) at least 24 hours before starting work that will impact a transit stop or route.
01/26/2015 All trenches and excavations must be barricaded and fenced per MUTCD, Part 6 and Additions by the City to the MUTCD, Part 6 standards and guides. Please refer to the City of Tucson Excavation Permit for additional requirements.
01/26/2015 It is your responsibility to periodically examine traffic control devices and warning signs. Reset, correct or make any needed changes to those devices or signs.
01/26/2015 "Share the Road with Care" signs are required for roadways that contain striped lanes and/or multi-use paths designated for bike usage.
01/26/2015 Employees that are exposed to public vehicular traffic shall be provided with, and shall wear, warning vests or suitable garments marked with or made of reflectorized or highly visible material rated as Class 2 or above. The warning vests or suitable garments shall meet or exceed ANSI/ISEA 107-2004 Standard for High Visibility Warning Clothing.
01/26/2015 Notify ParkWise (791-5071) at least 24 hours before starting work for any parking restrictions that may occur in the boundaries of South_22nd, North_Speedway, West_Grande and East_Campbell.
01/26/2015 As per City Ordinance No. 2657 - Section 25-13, a written permit is required from the City of Tucson Permits and Codes Section (791-5100) prior to cutting, trenching, excavating, improving or removing any object placed in a street, alley, public property or public right-of-way. Contractor is required to provide Traffic Engineering Barricade Section (791-4259) the Right-of-Way/Excavation Permit number with the Traffic Control Application.
01/26/2015 When sidewalk closures occur, sidewalks will be restricted on one side at a time with notification of sidewalk closure at corresponding intersections.
01/26/2015 ADVANCE WARNING SIGNS SHALL BE USED ON EVERY SETUP, including short term jobs that are less than 30 minutes to perform.
01/26/2015 Approved for devices placed in City of Tucson right of way.
01/26/2015 Hours are subject to change at the discretion of Traffic Engineering, based on impacts to an area. Contractor will be notified immediately for any changes that are required.

Documents

File Name Document Type  
T15TC00272.PDF BARRICADES VIEW