Permit: T15EX02725
Permit Details
Apply Date:
09/14/2015
Applicant:
SOUTHWEST GAS B*
Description:
(2) 3x3 POTHOLES IN DIRT ON WEST SIDE OF ROAD - TO POTHOLE GAS LINE
Outstanding Activity Conditions
Permit Number - T15EX02725
Permit Status: Final
Permit Description: (2) 3x3 POTHOLES IN DIRT ON WEST SIDE OF ROAD - TO POTHOLE GAS LINE
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 09/14/2015 | PAVEMENT PATCHES SHALL BE IN ACCORDANCE TO PC/COT STANDARD DETAIL 216. TYPE "B" PATCHES (CONCRETE SUB-BASE) ARE REQUIRED FOR ALL STREETS SHOWN ON THE CITY'S MAJOR STREETS AND ROUTES PLAN AND ALL INVERTED WATER CARRYING STREETS, SEE INSPECTOR FOR DETAILS. |
| 09/14/2015 | CONTRACTOR SHALL RESTORE ALL NON-PAVEMENT SURFACES DISTURBED BY CONSTRUCTION OR DAMAGED BY THE CONTRACTOR, IN ACCORDANCE WITH CITY STANDARDS AND SPECIFICATIONS FOR PUBLIC IMPROVEMENTS. |
Completed Inspections
Permit Status: Final
Permit Number: T15EX02725
Permit Description: (2) 3x3 POTHOLES IN DIRT ON WEST SIDE OF ROAD - TO POTHOLE GAS LINE
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/22/2015 | TDOT-EXCAV GENERAL INSPECTION | jcastro | Approved | Potholes work in dirt shoulder completed. |