Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T15EX02401
Permit Details
Apply Date:
08/10/2015
Applicant:
LLOYD CONSTRUCTION
Description:
FOOTING EXCAVATION FOR AC HOTEL TUCSON, ELECTRICAL LINES CROSSING AZ AV - 150' R2 RENEWAL*** NO LANES IMPACTED FOR HOLIDAY RESTRICTIONS WORK WILL BE DONE IN THE ALLEY ON ARIZONA AV 7/21/17 ADDED: SIDEWALK DEMO, ROAD CUT WITH DEMO OF ASPHALT AND CONCRETE, POUR CURBS, POUR FLATWORK, LANDSCAPE, IRRIGATION, MILLING, PAVING, DRIVEWAY APRON
Contractors:
- DAYS EXCAVATING
Outstanding Activity Conditions
Permit Number - T15EX02401
Permit Status: Final
Permit Description: FOOTING EXCAVATION FOR AC HOTEL TUCSON, ELECTRICAL LINES CROSSING AZ AV - 150'
R2 RENEWAL*** NO LANES IMPACTED FOR HOLIDAY RESTRICTIONS WORK WILL BE DONE IN THE ALLEY ON ARIZONA AV
7/21/17 ADDED:
SIDEWALK DEMO, ROAD CUT WITH DEMO OF ASPHALT AND CONCRETE, POUR CURBS, POUR FLATWORK, LANDSCAPE, IRRIGATION, MILLING, PAVING, DRIVEWAY APRON
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
08/12/2015 | PAVEMENT PATCHES SHALL BE IN ACCORDANCE TO PC/COT STANDARD DETAIL 216. TYPE "B" PATCHES (CONCRETE SUB-BASE) ARE REQUIRED FOR ALL STREETS SHOWN ON THE CITY'S MAJOR STREETS AND ROUTES PLAN AND ALL INVERTED WATER CARRYING STREETS, SEE INSPECTOR FOR DETAILS. |
08/12/2015 | CONTRACTOR SHALL RESTORE ALL NON-PAVEMENT SURFACES DISTURBED BY CONSTRUCTION OR DAMAGED BY THE CONTRACTOR, IN ACCORDANCE WITH CITY STANDARDS AND SPECIFICATIONS FOR PUBLIC IMPROVEMENTS. |
08/10/2015 | PRIOR TO COMMENCEMENT OF WORK, PLEASE CALL CITY OF TUCSON DOT INSPECTOR DAN ROBERTSON AT 520-400-6722 TO ARRANGE FOR A PRE-CONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Final
Permit Number: T15EX02401
Permit Description: FOOTING EXCAVATION FOR AC HOTEL TUCSON, ELECTRICAL LINES CROSSING AZ AV - 150'
R2 RENEWAL*** NO LANES IMPACTED FOR HOLIDAY RESTRICTIONS WORK WILL BE DONE IN THE ALLEY ON ARIZONA AV
7/21/17 ADDED:
SIDEWALK DEMO, ROAD CUT WITH DEMO OF ASPHALT AND CONCRETE, POUR CURBS, POUR FLATWORK, LANDSCAPE, IRRIGATION, MILLING, PAVING, DRIVEWAY APRON
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/28/2017 | TDOT-EXCAV GENERAL INSPECTION | cfarren | Approved | - work completed - close permit |