Permit Details

Status:
Final
Type:
STREET EXCAVATION
Apply Date:
07/02/2015
Applicant:
COX COMMUNICATIONS**B
Description:
Starting from Cox ped on the W/side of Oak Tree Dr, pothole 3'x3'x3' to bore street east 62ft and then continue bore east 38ft dirt/rocks/concrete. Trench turns north 57ft dirt and then continues east out of ROW. MODIFIED DESCRIPTION PER RL-07/09/2015- THERE NEEDS TO BE A MINIMUM OF 2 FEET SEPARATION FROM THE BOTTOM OF THE CHANNEL AND BORE.
Contractors:
  • ALPHA UNDERGROUND CONSTRUCTION CO INC *APA

Outstanding Activity Conditions

Permit Number - T15EX02046
Permit Status: Final
Permit Description: Starting from Cox ped on the W/side of Oak Tree Dr, pothole 3'x3'x3' to bore street east 62ft and then continue bore east 38ft dirt/rocks/concrete. Trench turns north 57ft dirt and then continues east out of ROW. MODIFIED DESCRIPTION PER RL-07/09/2015- THERE NEEDS TO BE A MINIMUM OF 2 FEET SEPARATION FROM THE BOTTOM OF THE CHANNEL AND BORE.
Total Outstanding Activity Conditions - 3
Date Name
07/02/2015 PRIOR TO COMMENCEMENT OF WORK, PLEASE CALL CITY OF TUCSON DOT INSPECTOR JAMES CASTRO AT 520-400-6609 TO ARRANGE FOR PRE-CONSTRUCTION MEETING.
07/02/2015 PAVEMENT PATCHES SHALL BE IN ACCORDANCE TO PC/COT STANDARD DETAIL 216. TYPE "B" PATCHES (CONCRETE SUB-BASE) ARE REQUIRED FOR ALL STREETS SHOWN ON THE CITY'S MAJOR STREETS AND ROUTES PLAN AND ALL INVERTED WATER CARRYING STREETS, SEE INSPECTOR FOR DETAILS.
07/02/2015 CONTRACTOR SHALL RESTORE ALL NON-PAVEMENT SURFACES DISTURBED BY CONSTRUCTION OR DAMAGED BY THE CONTRACTOR, IN ACCORDANCE WITH CITY STANDARDS AND SPECIFICATIONS FOR PUBLIC IMPROVEMENTS.

Completed Inspections

Permit Status: Final
Permit Number: T15EX02046
Permit Description: Starting from Cox ped on the W/side of Oak Tree Dr, pothole 3'x3'x3' to bore street east 62ft and then continue bore east 38ft dirt/rocks/concrete. Trench turns north 57ft dirt and then continues east out of ROW. MODIFIED DESCRIPTION PER RL-07/09/2015- THERE NEEDS TO BE A MINIMUM OF 2 FEET SEPARATION FROM THE BOTTOM OF THE CHANNEL AND BORE.
Total Completed Inspections - 1
Date Description Inspector Results Comments
03/14/2016 TDOT-EXCAV GENERAL INSPECTION JC Approved All work has been completed in area,no concerns.

Documents

File Name Document Type  
T15EX02046.PDF EXCAVATION VIEW
T15EX02046 R1.PDF EXCAVATION VIEW