Permit Details

Status:
Closed
Type:
OTHER REPAIRS
Apply Date:
04/04/2015
Applicant:
COX COMMUNICATIONS**B
Description:
From Cox ped on the E/side of Calexico Ave bore street S/W 55ft to ped. From ped trench north 13ft dirt and bore driveway 10ft north. Trench continues north 62ft dirt to Cox ped. WORK ORDER NUMBER: 41505150000REBCBLR

Outstanding Activity Conditions

Permit Number - T15EX00492
Permit Status: Closed
Permit Description: From Cox ped on the E/side of Calexico Ave bore street S/W 55ft to ped. From ped trench north 13ft dirt and bore driveway 10ft north. Trench continues north 62ft dirt to Cox ped. WORK ORDER NUMBER: 41505150000REBCBLR
Total Outstanding Activity Conditions - 7
Date Name
04/04/2015 ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS.
04/04/2015 EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE.
04/04/2015 PRIOR TO COMMENCEMENT OF WORK, PLEASE CALL CITY OF TUCSON DOT INSPECTOR JAMES CASTRO AT 520-400-6609 TO ARRANGE FOR PRE-CONSTRUCTION MEETING.
04/04/2015 PAVEMENT PATCHES SHALL BE IN ACCORDANCE TO PC/COT STANDARD DETAIL 216. TYPE "B" PATCHES (CONCRETE SUB-BASE) ARE REQUIRED FOR ALL STREETS SHOWN ON THE CITY'S MAJOR STREETS AND ROUTES PLAN AND ALL INVERTED WATER CARRYING STREETS, SEE INSPECTOR FOR DETAILS.
04/04/2015 ANY DAMAGE TO PUBLIC OR PRIVATE PROPERTY AS A RESULT OF CONTRACTOR'S OPERATIONS SHALL BE RESTORED IN KIND BY CONTRACTOR AT NO COST TO THE CITY.
04/04/2015 ALL WORK CONDUCTED WITHOUT OBTAINING THE PROPER INSPECTIONS, OR PRIOR APPROVALS, FROM THE TDOT CONSTRUCTION INSPECTION, SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT NO COST TO THE CITY.
04/04/2015 A COPY OF THIS PERMIT SHALL BE AVAILABLE ON SITE FOR CITY REVIEW AT ALL TIMES.

Documents

File Name Document Type  
T15EX00492.PDF EXCAVATION VIEW