Permit: T15EX00449
Permit Details
Status:
Final
Type:
RIGHT OF WAY IMPROVMENTS
Address:
N/A
Apply Date:
04/03/2015
Applicant:
N/A
Description:
18' OF DRIVEWAY AND 60' OF CITY SIDEWALK
Contractors:
- PULTE HOME CORP AZ *APA*
- SOUTHEWEST CONCRETE
Outstanding Activity Conditions
Permit Number - T15EX00449
Permit Status: Final
Permit Description: 18' OF DRIVEWAY AND 60' OF CITY SIDEWALK
Total Outstanding Activity Conditions - 7
Date | Name |
---|---|
04/03/2015 | ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS. |
04/03/2015 | EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE. |
04/03/2015 | PRIOR TO COMMENCEMENT OF WORK, PLEASE CALL CITY OF TUCSON DOT INSPECTOR JAMES CASTRO AT 520-400-6609 TO ARRANGE FOR PRE-CONSTRUCTION MEETING. |
04/03/2015 | PAVEMENT PATCHES SHALL BE IN ACCORDANCE TO PC/COT STANDARD DETAIL 216. TYPE "B" PATCHES (CONCRETE SUB-BASE) ARE REQUIRED FOR ALL STREETS SHOWN ON THE CITY'S MAJOR STREETS AND ROUTES PLAN AND ALL INVERTED WATER CARRYING STREETS, SEE INSPECTOR FOR DETAILS. |
04/03/2015 | ANY DAMAGE TO PUBLIC OR PRIVATE PROPERTY AS A RESULT OF CONTRACTOR'S OPERATIONS SHALL BE RESTORED IN KIND BY CONTRACTOR AT NO COST TO THE CITY. |
04/03/2015 | ALL WORK CONDUCTED WITHOUT OBTAINING THE PROPER INSPECTIONS, OR PRIOR APPROVALS, FROM THE TDOT CONSTRUCTION INSPECTION, SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT NO COST TO THE CITY. |
04/03/2015 | A COPY OF THIS PERMIT SHALL BE AVAILABLE ON SITE FOR CITY REVIEW AT ALL TIMES. |
Completed Inspections
Permit Status: Final
Permit Number: T15EX00449
Permit Description: 18' OF DRIVEWAY AND 60' OF CITY SIDEWALK
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/28/2015 | TDOT-EXCAV GENERAL INSPECTION | jcastro | Approved | Sidewalk,driveway apron work has been completed. |