Permit: T15EX00358
Permit Details
Apply Date:
03/23/2015
Applicant:
TUCSON ELECTRIC POWER **B
Description:
TEP TO DIG 3' HOLE TO REPLACE POLE AND TRENCH TEP 10-15' IN DIRT TO TRANSFER RISER. NO IMPACT TO SIDEWALK. WORK ORDER #289170 POLE TO BE REMOVED AS SOON AS POSSIBLE. Pole Install 10:00PM to 07:00AM ****NIGHT TIME ONLY FOR 2 LANE CLOSURE********* Daytime ok for Wire work during OFF-PEAK travel times
Outstanding Activity Conditions
Permit Number - T15EX00358
Permit Status: Closed
Permit Description: TEP TO DIG 3' HOLE TO REPLACE POLE AND TRENCH TEP 10-15' IN DIRT TO TRANSFER RISER. NO IMPACT TO SIDEWALK.
WORK ORDER #289170
POLE TO BE REMOVED AS SOON AS POSSIBLE.
Pole Install 10:00PM to 07:00AM ****NIGHT TIME ONLY FOR 2 LANE
CLOSURE********* Daytime ok for Wire work during OFF-PEAK
travel times
Total Outstanding Activity Conditions - 7
Date | Name |
---|---|
03/23/2015 | ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS. |
03/23/2015 | EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE. |
03/23/2015 | PRIOR TO COMMENCEMENT OF WORK, PLEASE CALL CITY OF TUCSON DOT INSPECTOR JOSE CAZARES AT 520-437-5849 TO ARRANGE FOR PRE-CONSTRUCTION MEETING. |
03/23/2015 | PAVEMENT PATCHES SHALL BE IN ACCORDANCE TO PC/COT STANDARD DETAIL 216. TYPE "B" PATCHES (CONCRETE SUB-BASE) ARE REQUIRED FOR ALL STREETS SHOWN ON THE CITY'S MAJOR STREETS AND ROUTES PLAN AND ALL INVERTED WATER CARRYING STREETS, SEE INSPECTOR FOR DETAILS. |
03/23/2015 | ANY DAMAGE TO PUBLIC OR PRIVATE PROPERTY AS A RESULT OF CONTRACTOR'S OPERATIONS SHALL BE RESTORED IN KIND BY CONTRACTOR AT NO COST TO THE CITY. |
03/23/2015 | ALL WORK CONDUCTED WITHOUT OBTAINING THE PROPER INSPECTIONS, OR PRIOR APPROVALS, FROM THE TDOT CONSTRUCTION INSPECTION, SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT NO COST TO THE CITY. |
03/23/2015 | A COPY OF THIS PERMIT SHALL BE AVAILABLE ON SITE FOR CITY REVIEW AT ALL TIMES. |