Permit Details

Status:
Expired
Type:
RIGHT OF WAY IMPROVMENTS
Address:
7501 E 22ND ST
Address NEW:
7501 E 22ND ST
Apply Date:
03/04/2015
Applicant:
N/A
Description:
Install new pipeline facilities in dirt open trench excavation: 93' of 12" Steel, 255' of 8" Steel, 19' of 6" Steel, 32' of 4" Steel. Install new pipeline facilities in pavement open trench excavation: 1,341' of 12" Steel, 1,482' of 8" steel, 22' of 6" Steel, 3' of 4" Steel, 206' of 2" Steel. Install new pipeline facilities under sidewalk: 1,728' of 12" Steel. Install new pipeline facilities along bridge: 318' of 8" Steel. Work schedule is anticipated to begin March 9, 2015 and end by July 17, 2015. All pipe to be installed within 22nd Street Overlay project scope will be installed by April 30, 2015. All new pipeline facilities are to be installed within City of Tucson ROW.
Contractors:
  • UNDERGROUND CONSTRUCTION CO INC

Outstanding Activity Conditions

Permit Number - T15EX00243
Permit Status: Expired
Permit Description: Install new pipeline facilities in dirt open trench excavation: 93' of 12" Steel, 255' of 8" Steel, 19' of 6" Steel, 32' of 4" Steel. Install new pipeline facilities in pavement open trench excavation: 1,341' of 12" Steel, 1,482' of 8" steel, 22' of 6" Steel, 3' of 4" Steel, 206' of 2" Steel. Install new pipeline facilities under sidewalk: 1,728' of 12" Steel. Install new pipeline facilities along bridge: 318' of 8" Steel. Work schedule is anticipated to begin March 9, 2015 and end by July 17, 2015. All pipe to be installed within 22nd Street Overlay project scope will be installed by April 30, 2015. All new pipeline facilities are to be installed within City of Tucson ROW.
Total Outstanding Activity Conditions - 6
Date Name
03/04/2015 ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS.
03/04/2015 EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE.
03/04/2015 PAVEMENT PATCHES SHALL BE IN ACCORDANCE TO PC/COT STANDARD DETAIL 216. TYPE "B" PATCHES (CONCRETE SUB-BASE) ARE REQUIRED FOR ALL STREETS SHOWN ON THE CITY'S MAJOR STREETS AND ROUTES PLAN AND ALL INVERTED WATER CARRYING STREETS, SEE INSPECTOR FOR DETAILS.
03/04/2015 ANY DAMAGE TO PUBLIC OR PRIVATE PROPERTY AS A RESULT OF CONTRACTOR'S OPERATIONS SHALL BE RESTORED IN KIND BY CONTRACTOR AT NO COST TO THE CITY.
03/04/2015 ALL WORK CONDUCTED WITHOUT OBTAINING THE PROPER INSPECTIONS, OR PRIOR APPROVALS, FROM THE TDOT CONSTRUCTION INSPECTION, SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT NO COST TO THE CITY.
03/11/2015 PLEASE CONTACT GARY WITTWER 400-2645 FOR RIGHT-OF-WAY LANDSCAPING.

Documents

File Name Document Type  
T15EX00243.PDF EXCAVATION VIEW
T15EX00243.R1PDF EXCAVATION VIEW