Permit Details

Status:
Expired
Type:
OTHER REPAIRS
Address:
1300 E 6TH ST
Apply Date:
03/03/2015
Applicant:
COX COMMUNICATIONS**B
Description:
70' dirt trench and set a service ped
Contractors:
  • A1 COMMUNICATIONS LLC

Outstanding Activity Conditions

Permit Number - T15EX00237
Permit Status: Expired
Permit Description: 70' dirt trench and set a service ped
Total Outstanding Activity Conditions - 6
Date Name
03/03/2015 ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS.
03/03/2015 EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE.
03/04/2015 PRIOR TO COMMENCEMENT OF WORK, PLEASE CALL CITY OF TUCSON DOT INSPECTOR CHRIS MCNELLIS AT 520-403-2408 TO ARRANGE FOR A PRE-CONSTRUCTION MEETING.
03/03/2015 PAVEMENT PATCHES SHALL BE IN ACCORDANCE TO PC/COT STANDARD DETAIL 216. TYPE "B" PATCHES (CONCRETE SUB-BASE) ARE REQUIRED FOR ALL STREETS SHOWN ON THE CITY'S MAJOR STREETS AND ROUTES PLAN AND ALL INVERTED WATER CARRYING STREETS, SEE INSPECTOR FOR DETAILS.
03/03/2015 ANY DAMAGE TO PUBLIC OR PRIVATE PROPERTY AS A RESULT OF CONTRACTOR'S OPERATIONS SHALL BE RESTORED IN KIND BY CONTRACTOR AT NO COST TO THE CITY.
03/03/2015 ALL WORK CONDUCTED WITHOUT OBTAINING THE PROPER INSPECTIONS, OR PRIOR APPROVALS, FROM THE TDOT CONSTRUCTION INSPECTION, SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT NO COST TO THE CITY.