Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Closed
Type:
SIDEWALK INSTALLATION
Apply Date:
02/17/2015
Applicant:
PULTE HOMES
Description:
47' Of City Sidewalk and 18' Of Driveway Per Standard Detail 206 Per RL
Contractors:
  • PULTE HOME CORP AZ *APA*
  • SOUTHWEST CONCRETE INC

Outstanding Activity Conditions

Permit Number - T15EX00117
Permit Status: Closed
Permit Description: 47' Of City Sidewalk and 18' Of Driveway Per Standard Detail 206 Per RL
Total Outstanding Activity Conditions - 5
Date Name
02/17/2015 ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS.
02/17/2015 EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE.
02/17/2015 PAVEMENT PATCHES SHALL BE IN ACCORDANCE TO PC/COT STANDARD DETAIL 216. TYPE "B" PATCHES (CONCRETE SUB-BASE) ARE REQUIRED FOR ALL STREETS SHOWN ON THE CITY'S MAJOR STREETS AND ROUTES PLAN AND ALL INVERTED WATER CARRYING STREETS, SEE INSPECTOR FOR DETAILS.
02/17/2015 ANY DAMAGE TO PUBLIC OR PRIVATE PROPERTY AS A RESULT OF CONTRACTOR'S OPERATIONS SHALL BE RESTORED IN KIND BY CONTRACTOR AT NO COST TO THE CITY.
02/17/2015 ALL WORK CONDUCTED WITHOUT OBTAINING THE PROPER INSPECTIONS, OR PRIOR APPROVALS, FROM THE TDOT CONSTRUCTION INSPECTION, SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT NO COST TO THE CITY.

Completed Inspections

Permit Status: Closed
Permit Number: T15EX00117
Permit Description: 47' Of City Sidewalk and 18' Of Driveway Per Standard Detail 206 Per RL
Total Completed Inspections - 1
Date Description Inspector Results Comments
07/22/2015 TDOT-EXCAV GENERAL INSPECTION JCastro Approved Driveway,sidewalk work completed per COT standard.

Documents

File Name Document Type  
T15EX00117.PDF EXCAVATION VIEW