Permit Details

Status:
Expired
Type:
RIGHT OF WAY IMPROVMENTS
Address NEW:
8129 E MCLAREN ST
Apply Date:
02/06/2015
Applicant:
JODY SETTLES
Description:
TRENCHING OR BORING 180' IN PAVEMENT; 50' IN DIRT; WRIGHTSTOWN RD, WRIGHTSTOWN TERRACE DR. (USED ADDRESS OF 8129 E MCLAREN ST AS START POINT) WR1816077-AAREPL 0123 *RENEWED TILL 06/06/15 *
Contractors:
  • NORTHERN PIPELINE

Outstanding Activity Conditions

Permit Number - T15EX00097
Permit Status: Expired
Permit Description: TRENCHING OR BORING 180' IN PAVEMENT; 50' IN DIRT; WRIGHTSTOWN RD, WRIGHTSTOWN TERRACE DR. (USED ADDRESS OF 8129 E MCLAREN ST AS START POINT) WR1816077-AAREPL 0123 *RENEWED TILL 06/06/15 *
Total Outstanding Activity Conditions - 6
Date Name
06/05/2015 CITY OF TUCSON PDSD - REVIEWED UNDER GREEN BUILDING STANDARDS. CERTIFICATION SUBJECT TO ON-SITE INSPECTIONS AND FINAL REVIEW AND VERIFICATION OF DOCUMENTS.
02/06/2015 ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS.
02/06/2015 EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE.
02/06/2015 PAVEMENT PATCHES SHALL BE IN ACCORDANCE TO PC/COT STANDARD DETAIL 216. TYPE "B" PATCHES (CONCRETE SUB-BASE) ARE REQUIRED FOR ALL STREETS SHOWN ON THE CITY'S MAJOR STREETS AND ROUTES PLAN AND ALL INVERTED WATER CARRYING STREETS, SEE INSPECTOR FOR DETAILS.
02/06/2015 ANY DAMAGE TO PUBLIC OR PRIVATE PROPERTY AS A RESULT OF CONTRACTOR'S OPERATIONS SHALL BE RESTORED IN KIND BY CONTRACTOR AT NO COST TO THE CITY.
02/06/2015 ALL WORK CONDUCTED WITHOUT OBTAINING THE PROPER INSPECTIONS, OR PRIOR APPROVALS, FROM THE TDOT CONSTRUCTION INSPECTION, SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT NO COST TO THE CITY.

Documents

File Name Document Type  
T15EX00097.PDF EXCAVATION VIEW
T15EX00097REV1.PDF EXCAVATION VIEW
T15EX00097R1.PDF EXCAVATION VIEW