Permit Details

Status:
Closed
Type:
OTHER REPAIRS
Address:
6147 E GRANT RD
Apply Date:
02/02/2015
Applicant:
CENTURY LINK (QWEST)
Description:
TRENCH 23 FT. FROM EXISTING CTL HANDHOLE TO EXISTING CTL PEDESTAL at SE corner of 6107 E Grant Rd. ADDITIONALLY THE PLACEMENT OF A NEW CTL CABINET -Equipment used BACKHOE
Contractors:
  • FISHEL CONSTRUCTION COMPANY (FN)

Outstanding Activity Conditions

Permit Number - T15EX00086
Permit Status: Closed
Permit Description: TRENCH 23 FT. FROM EXISTING CTL HANDHOLE TO EXISTING CTL PEDESTAL at SE corner of 6107 E Grant Rd. ADDITIONALLY THE PLACEMENT OF A NEW CTL CABINET -Equipment used BACKHOE
Total Outstanding Activity Conditions - 6
Date Name
02/02/2015 ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS.
02/02/2015 EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE.
02/02/2015 PAVEMENT PATCHES SHALL BE IN ACCORDANCE TO PC/COT STANDARD DETAIL 216. TYPE "B" PATCHES (CONCRETE SUB-BASE) ARE REQUIRED FOR ALL STREETS SHOWN ON THE CITY'S MAJOR STREETS AND ROUTES PLAN AND ALL INVERTED WATER CARRYING STREETS, SEE INSPECTOR FOR DETAILS.
02/02/2015 ANY DAMAGE TO PUBLIC OR PRIVATE PROPERTY AS A RESULT OF CONTRACTOR'S OPERATIONS SHALL BE RESTORED IN KIND BY CONTRACTOR AT NO COST TO THE CITY.
02/02/2015 ALL WORK CONDUCTED WITHOUT OBTAINING THE PROPER INSPECTIONS, OR PRIOR APPROVALS, FROM THE TDOT CONSTRUCTION INSPECTION, SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT NO COST TO THE CITY.
02/03/2015 PRIOR TO COMMENCEMENT OF WORK, PLEASE CALL CITY OF TUCSON DOT INSPECTOR DONNY RUSSELL AT 520-400-3299 TO ARRANGE FOR PRE-CONSTRUCTION MEETING.

Documents

File Name Document Type  
T15EX00086.PDF BARRICADES VIEW