Permit: T15CM07218
Permit Details
Apply Date:
10/16/2015
Applicant:
RAWSON, RHONDA LEE
Description:
T.I;OFFICE
Architects:
- RAWSON, RHONDA LEE
Contractors:
- BARKER MORRISSEY CONTRACTING INC **APA**
Permit Reviews
Permit Number - T15CM07218
Permit Status: L of c
Permit Description: T.I;OFFICE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/16/2015 | COMMERCIAL - TI | 10/23/2015 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T15CM07218
Permit Status: L of c
Permit Description: T.I;OFFICE
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
10/16/2015 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: L of c
Permit Number: T15CM07218
Permit Description: T.I;OFFICE
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/04/2015 | PLUMBING - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :* |
11/04/2015 | PLUMBING - ROUGH, SOIL | JMILITEL | Approved | IVRS - Inspection :* |
11/17/2015 | FRAMING | JMILITEL | Approved | IVRS - Inspection :* |
11/19/2015 | ELECTRIC - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :* |
11/19/2015 | SHEET ROCK NAILING | JMILITEL | Approved | IVRS - Inspection :* |
12/23/2015 | MECHANICAL - ABOVE CEILING | JMILITEL | Approved | IVRS - Inspection :* |
12/23/2015 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :* |
12/23/2015 | PLUMBING - PROGRESS | JMILITEL | Approved | IVRS - Inspection :* |
12/23/2015 | PLUMBING - ABOVE CEILING | JMILITEL | Approved | IVRS - Inspection :* |
12/23/2015 | ELECTRIC - ABOVE CEILING | JMILITEL | Approved | IVRS - Inspection :* |
12/23/2015 | BUILDING - PROGRESS | JMILITEL | Approved | IVRS - Inspection :* |
12/23/2015 | BUILDING ABOVE CEILING | JMILITEL | Approved | IVRS - Inspection :* |
12/23/2015 | RIGHT OF WAY - FINAL | JCAZARES | Approved | |
12/24/2015 | NPPO - FINAL | RLEDONNE | Approved | |
12/24/2015 | SIGN - FINAL | RLEDONNE | Approved | |
12/24/2015 | LANDSCAPE - FINAL | RLEDONNE | Approved | |
12/24/2015 | ENGINEERING - FINAL | RLEDONNE | Approved | |
12/30/2015 | BUILDING - FINAL | JMILITEL | Approved | PROVIDE DRYER VENT PROVIDE ROOF ACCESS PROVIDE AIR BALANCE + CLORINATION REPORT |
12/30/2015 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection :* |
12/30/2015 | PLUMBING - FINAL | JMILITEL | Approved | IVRS - Inspection :* |
12/30/2015 | ELECTRIC - FINAL | JMILITEL | Approved | IVRS - Inspection :* |
12/30/2015 | FIRE - FINAL | cclark1 | Approved | 1. Remove bars and hardware from double doors in warehouse area. 2.East facing double door in warehouse shall be locked and signed "this door blocked" per plans 3.Remove exit sign about double doors that will not be used for an exit. 4.Repair or remove emergency lighting in warehouse area. ( Not required to have, but if it's left in place it muct work). 5.Remove all hardware from doors that will no longer be used as doors or will be blocked and sign from outside "this door blocked" 6.Mount all fire extinguishers 7.Address needs to be on the front of the new entrace and all other suite numbers from existing suites need to be removed. |