Permit: T15CM05003
Permit Details
Apply Date:
07/20/2015
Applicant:
N/A
Description:
HACIENDA AT THE RIVER- ASSISTED LIVING - BLDG 3
Architects:
- KORY DINGLE
Contractors:
- WEITZ COMPANY L L C *C
Permit Reviews
Permit Number - T15CM05003
Permit Status: C of o
Permit Description: HACIENDA AT THE RIVER- ASSISTED LIVING - BLDG 3
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/23/2016 | REVISION - - 1ST | 02/23/2016 | ACTIVE |
Outstanding Activity Conditions
Permit Number - T15CM05003
Permit Status: C of o
Permit Description: HACIENDA AT THE RIVER- ASSISTED LIVING - BLDG 3
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 07/20/2015 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T15CM05003
Permit Description: HACIENDA AT THE RIVER- ASSISTED LIVING - BLDG 3
Total Completed Inspections - 44
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/31/2015 | ELECTRIC - UNDERGROUND | BSTEVENS | Approved | |
| 12/31/2015 | PLUMBING - ROUGH, SOIL | BSTEVENS | Approved | |
| 03/16/2016 | REINFORCED MASONRY PRE-GROUT | BSTEVENS | Approved | IVRS - Inspection :* |
| 05/27/2016 | BUILDING PRE-SLAB | BSTEVENS | Approved | |
| 06/14/2016 | STUCCO MESH | BSTEVENS | Approved | |
| 07/07/2016 | U VALUE FOR WINDOW | BSTEVENS | Approved | |
| 07/11/2016 | PLUMBING - INTERMEDIATE | BSTEVENS | Approved | |
| 08/16/2016 | PLUMBING - YARD WTR LINE/TEST | BSTEVENS | Approved | IVRS - Inspection :* |
| 09/01/2016 | ELECTRIC - PROGRESS | BSTEVENS | Approved | |
| 09/01/2016 | ELECTRIC - SERVICE UPGRADE | BSTEVENS | Approved | |
| 09/01/2016 | ELECTRIC - TEMPORARY SERVICE | BSTEVENS | Approved | |
| 09/01/2016 | ELECTRIC - CONSTRUCTION POWER | BSTEVENS | Approved | |
| 10/05/2016 | PLUMBING - GAS PRESSURE TEST | BRUCE_S | Approved | CLEAR GAS HOOKUP |
| 10/12/2016 | GAS CLEARANCE | BSTEVENS | Approved | |
| 10/25/2016 | MECHANICAL - HOODS | BSTEVENS | Approved | |
| 11/03/2016 | MECHANICAL - INTERMEDIATE | BSTEVENS | Approved | |
| 11/03/2016 | PLUMBING - PROGRESS | BSTEVENS | Approved | |
| 11/03/2016 | SITE - SEWER | BSTEVENS | Approved | |
| 11/03/2016 | PLUMBING - ROOF DRAINS | BSTEVENS | Approved | |
| 11/03/2016 | OUTDOOR LIGHTING FINAL | BSTEVENS | Approved | |
| 11/03/2016 | ELECTRIC - OUTDOOR LIGHTING | BSTEVENS | Approved | |
| 11/03/2016 | ELECTRIC - ABOVE CEILING | BSTEVENS | Approved | |
| 11/03/2016 | ELECTRIC - INTERMEDIATE | BSTEVENS | Approved | |
| 11/03/2016 | ELECTRIC - UFER | BSTEVENS | Approved | |
| 11/03/2016 | BUILDING - PROGRESS | BSTEVENS | Approved | |
| 11/03/2016 | BUILDING ABOVE CEILING | BSTEVENS | Approved | |
| 11/03/2016 | SHEET ROCK NAILING | BSTEVENS | Approved | |
| 11/03/2016 | FIREWALL/FIREBARRIER/FIRESTOP | BSTEVENS | Approved | |
| 11/03/2016 | FRAMING | BSTEVENS | Approved | |
| 11/03/2016 | ROOF NAILING | BSTEVENS | Approved | |
| 11/03/2016 | EXT METAL CLIPS/EXT SHEATHING | BSTEVENS | Approved | |
| 11/03/2016 | STEM WALL/RETAINING WALL | BSTEVENS | Approved | |
| 11/03/2016 | EXCAVATION/LAYOUT REBAR & ZON | BSTEVENS | Approved | |
| 11/10/2016 | HEALTH DEPT - FINAL 724-7908 | J.KINCAID | Approved | |
| 11/16/2016 | FIRE - FINAL | CBASALDUA | Approved | |
| 11/16/2016 | BUILDING - FINAL | BSTEVENS | Approved | PENDING FINAL APPROVAL OF ALL OTHER FINALS RECOMMEND ISSUANCEOF TCO FOR BUILDINGS 2 AND 3 ONLY |
| 11/16/2016 | MECHANICAL - FINAL | BSTEVENS | Approved | |
| 11/16/2016 | PLUMBING - FINAL | BSTEVENS | Approved | |
| 11/16/2016 | ELECTRIC - FINAL | BSTEVENS | Approved | |
| 11/16/2016 | ENGINEERING - FINAL | DROBERTS | Approved | MET WITH MEMBERS OF WEITZ COMPANY ON SITE AND ADVISED THEM THAT THE HANDICAP PARKING LOCATED NORTH OF THE SITE DOES NOT MEET CODE IN SOME OF THE SLOPE AREAS AND IN THE CONCRETE SIDEWALK SOUTH OF THE PARKING SPACES. THEY WILL BE WORKING TO MAKE THE NECESSARY REPAIS TO THE ACCESS SPACES, SIDEWALK, AND IN THE PEDESTRIAN ACCESS PATH COMING IN FROM RIVER ROAD PRIOR TO SEEKING THE FINAL APPROVAL FOR THE FULL CERTIFICATE OF OCCUPANCY. THIS SITE IS OKAY FOR THE TEMPORARY C OF O AT THIS TIME FOR THE PURPOSE OF HAVING THE STATE START THEIR PAPERWORK, BUT NEEDS TO BE RECHECK PRIOR TO ALLOWING PATIENCE INTO THIS SITE. |
| 11/17/2016 | RIGHT OF WAY - FINAL | drobertson | Approved | Partial approval for temp C of O |
| 01/31/2017 | NPPO - FINAL | MRUSSO | Approved | |
| 01/31/2017 | SIGN - FINAL | MRUSSO | Approved | |
| 01/31/2017 | LANDSCAPE - FINAL | MRUSSO | Approved |