Permit Details

Status:
Closed
Type:
RIGHT OF WAY IMPROVMENTS
Address:
2543 E 22ND ST
Address NEW:
2543 E 22ND ST
Apply Date:
12/24/2014
Applicant:
MTW CONSTRUCTION
Description:
PLACE A DRIVEWAY APRON PER PC/COT SD 206 AND SIDEWALK PER SD 200; 4FT WIDE; 60LF CONTACT PARK TUCSON AT 520-791-5071; THIS IS A PERMIT AREA.

Outstanding Activity Conditions

Permit Number - T14EX01404
Permit Status: Closed
Permit Description: PLACE A DRIVEWAY APRON PER PC/COT SD 206 AND SIDEWALK PER SD 200; 4FT WIDE; 60LF CONTACT PARK TUCSON AT 520-791-5071; THIS IS A PERMIT AREA.
Total Outstanding Activity Conditions - 6
Date Name
12/24/2014 ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS.
12/24/2014 EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE.
12/26/2014 PRIOR TO COMMENCEMENT OF WORK, PLEASE CALL CITY OF TUCSON DOT INSPECTOR CHRIS MCNELLIS AT 520-403-2408 TO ARRANGE FOR A PRE-CONSTRUCTION MEETING.
12/24/2014 PAVEMENT PATCHES SHALL BE IN ACCORDANCE TO PC/COT STANDARD DETAIL 216. TYPE "B" PATCHES (CONCRETE SUB-BASE) ARE REQUIRED FOR ALL STREETS SHOWN ON THE CITY'S MAJOR STREETS AND ROUTES PLAN AND ALL INVERTED WATER CARRYING STREETS, SEE INSPECTOR FOR DETAILS.
12/24/2014 ANY DAMAGE TO PUBLIC OR PRIVATE PROPERTY AS A RESULT OF CONTRACTOR'S OPERATIONS SHALL BE RESTORED IN KIND BY CONTRACTOR AT NO COST TO THE CITY.
12/24/2014 ALL WORK CONDUCTED WITHOUT OBTAINING THE PROPER INSPECTIONS, OR PRIOR APPROVALS, FROM THE TDOT CONSTRUCTION INSPECTION, SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT NO COST TO THE CITY.