Permit: T14EX01305
Permit Details
Apply Date:
12/17/2014
Applicant:
TUCSON WATER
Description:
2 LF IN CONCRETE SIDEWALK
Outstanding Activity Conditions
Permit Number - T14EX01305
Permit Status: Closed
Permit Description: 2 LF IN CONCRETE SIDEWALK
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
12/17/2014 | ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS. |
12/17/2014 | EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE. |
12/17/2014 | PAVEMENT PATCHES SHALL BE IN ACCORDANCE TO PC/COT STANDARD DETAIL 216. TYPE "B" PATCHES (CONCRETE SUB-BASE) ARE REQUIRED FOR ALL STREETS SHOWN ON THE CITY'S MAJOR STREETS AND ROUTES PLAN AND ALL INVERTED WATER CARRYING STREETS, SEE INSPECTOR FOR DETAILS. |
12/17/2014 | ANY DAMAGE TO PUBLIC OR PRIVATE PROPERTY AS A RESULT OF CONTRACTOR'S OPERATIONS SHALL BE RESTORED IN KIND BY CONTRACTOR AT NO COST TO THE CITY. |
12/17/2014 | ALL WORK CONDUCTED WITHOUT OBTAINING THE PROPER INSPECTIONS, OR PRIOR APPROVALS, FROM THE TDOT CONSTRUCTION INSPECTION, SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT NO COST TO THE CITY. |