Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
RIGHT OF WAY IMPROVMENTS
Apply Date:
12/08/2014
Applicant:
ATTENTION TRANSIT ADVERTISING
Description:
INSTALL CONCRETE PAD AND INSTALL REMOTE ADVERTISING KIOSK W/NEW ELECTRICAL SUPPLY.SOUTHEAST CORNER
Contractors:
  • BROWNE CONSTRUCTION AND REMODELING

Outstanding Activity Conditions

Permit Number - T14EX01242
Permit Status: Final
Permit Description: INSTALL CONCRETE PAD AND INSTALL REMOTE ADVERTISING KIOSK W/NEW ELECTRICAL SUPPLY.SOUTHEAST CORNER
Total Outstanding Activity Conditions - 6
Date Name
12/08/2014 ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS.
12/08/2014 EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE.
12/08/2014 PAVEMENT PATCHES SHALL BE IN ACCORDANCE TO PC/COT STANDARD DETAIL 216. TYPE "B" PATCHES (CONCRETE SUB-BASE) ARE REQUIRED FOR ALL STREETS SHOWN ON THE CITY'S MAJOR STREETS AND ROUTES PLAN AND ALL INVERTED WATER CARRYING STREETS, SEE INSPECTOR FOR DETAILS.
12/08/2014 ANY DAMAGE TO PUBLIC OR PRIVATE PROPERTY AS A RESULT OF CONTRACTOR'S OPERATIONS SHALL BE RESTORED IN KIND BY CONTRACTOR AT NO COST TO THE CITY.
12/08/2014 ALL WORK CONDUCTED WITHOUT OBTAINING THE PROPER INSPECTIONS, OR PRIOR APPROVALS, FROM THE TDOT CONSTRUCTION INSPECTION, SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT NO COST TO THE CITY.
12/08/2014 PRIOR TO COMMENCEMENT OF WORK, PLEASE CALL CITY OF TUCSON DOT INSPECTOR DONNY RUSSELL AT 520-400-3299 TO ARRANGE FOR PRE-CONSTRUCTION MEETING.

Completed Inspections

Permit Status: Final
Permit Number: T14EX01242
Permit Description: INSTALL CONCRETE PAD AND INSTALL REMOTE ADVERTISING KIOSK W/NEW ELECTRICAL SUPPLY.SOUTHEAST CORNER
Total Completed Inspections - 1
Date Description Inspector Results Comments
06/18/2015 TDOT-EXCAV GENERAL INSPECTION DR Approved JOB WAS COMPLETE IN FEBRUARY. NO CONCERNS.