Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
RIGHT OF WAY IMPROVMENTS
Apply Date:
11/19/2014
Applicant:
HELEN ORMSBY
Description:
2-Irrigation Sleeves-Lots 31& 32/ Lots 1 & 55 Vanishing Pointe Way at Sandpiper between Lots 31 & 32 for first sleeve. Zabriskie Pointe Drive at Sandpiper between Lots 1 & 55. Boring under existing roadway to install sleeves to accommodate irrigation lines as noted on original landscape plan. Ad'l Requirements per RL- Irrigation lines shall be placed in 4" sch80 PVC pipe as sleeve and buried at a min 18" from top of sleeve. Curb shall be marked or stamped with "IS" on curb on both sides of roadway where Irrigation sleeve corsses curb. An isolation valve(s/o valve) shall be placed up stream of each roadway crossing. Irrigation lines are private facilities owned and operated by the Homeowners Association (HOA). The HOA shall be responsible bor the cost and repair to city roadway infrastructure in the event of damages resulting from an irrigation line break.
Contractors:
  • D R H TUCSON CONSTRUCTION

Outstanding Activity Conditions

Permit Number - T14EX01203
Permit Status: Final
Permit Description: 2-Irrigation Sleeves-Lots 31& 32/ Lots 1 & 55 Vanishing Pointe Way at Sandpiper between Lots 31 & 32 for first sleeve. Zabriskie Pointe Drive at Sandpiper between Lots 1 & 55. Boring under existing roadway to install sleeves to accommodate irrigation lines as noted on original landscape plan. Ad'l Requirements per RL- Irrigation lines shall be placed in 4" sch80 PVC pipe as sleeve and buried at a min 18" from top of sleeve. Curb shall be marked or stamped with "IS" on curb on both sides of roadway where Irrigation sleeve corsses curb. An isolation valve(s/o valve) shall be placed up stream of each roadway crossing. Irrigation lines are private facilities owned and operated by the Homeowners Association (HOA). The HOA shall be responsible bor the cost and repair to city roadway infrastructure in the event of damages resulting from an irrigation line break.
Total Outstanding Activity Conditions - 7
Date Name
11/19/2014 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
11/19/2014 ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS.
11/19/2014 EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE.
11/19/2014 PRIOR TO COMMENCEMENT OF WORK, PLEASE CALL CITY OF TUCSON DOT INSPECTOR JAMES CASTRO AT 520-400-6609 TO ARRANGE FOR PRE-CONSTRUCTION MEETING.
11/19/2014 PAVEMENT PATCHES SHALL BE IN ACCORDANCE TO PC/COT STANDARD DETAIL 216. TYPE "B" PATCHES (CONCRETE SUB-BASE) ARE REQUIRED FOR ALL STREETS SHOWN ON THE CITY'S MAJOR STREETS AND ROUTES PLAN AND ALL INVERTED WATER CARRYING STREETS, SEE INSPECTOR FOR DETAILS.
11/19/2014 ANY DAMAGE TO PUBLIC OR PRIVATE PROPERTY AS A RESULT OF CONTRACTOR'S OPERATIONS SHALL BE RESTORED IN KIND BY CONTRACTOR AT NO COST TO THE CITY.
11/19/2014 ALL WORK CONDUCTED WITHOUT OBTAINING THE PROPER INSPECTIONS, OR PRIOR APPROVALS, FROM THE TDOT CONSTRUCTION INSPECTION, SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT NO COST TO THE CITY.

Completed Inspections

Permit Status: Final
Permit Number: T14EX01203
Permit Description: 2-Irrigation Sleeves-Lots 31& 32/ Lots 1 & 55 Vanishing Pointe Way at Sandpiper between Lots 31 & 32 for first sleeve. Zabriskie Pointe Drive at Sandpiper between Lots 1 & 55. Boring under existing roadway to install sleeves to accommodate irrigation lines as noted on original landscape plan. Ad'l Requirements per RL- Irrigation lines shall be placed in 4" sch80 PVC pipe as sleeve and buried at a min 18" from top of sleeve. Curb shall be marked or stamped with "IS" on curb on both sides of roadway where Irrigation sleeve corsses curb. An isolation valve(s/o valve) shall be placed up stream of each roadway crossing. Irrigation lines are private facilities owned and operated by the Homeowners Association (HOA). The HOA shall be responsible bor the cost and repair to city roadway infrastructure in the event of damages resulting from an irrigation line break.
Total Completed Inspections - 1
Date Description Inspector Results Comments
06/01/2016 TDOT-EXCAV GENERAL INSPECTION JC Approved Sidewalk,driveway work has been completed,no concerns.