Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T14EX01186
Permit Details
Apply Date:
11/12/2014
Applicant:
JAMES DEROUSSEL RLA
Description:
CURB CORES ANS STREET SIDE STORMWATER HARVESTING BASINS PER TDOT STANDARD DETAILS & SPECS. PROPOSED BASIN LAYOUT, CURB INLET LOCATIONS AND TREE LOCATIONS ARE FOUND IN THE DRAWINGS. 1'MIN. SETBACK FROM SIDEWALK; BOTTOM OF BASIN-ELEV-0.67'-BOTTOM OF CURB ELEV.0.0'-TWO (2) X4" CURB CORES PER BASIN 8" MIN SPACING. CORES PER COT STANDARD DETAIL. 2" MIN SETBACK FROM CURB, TYPICAL. EXISTING FLUSH CURB TO BE USED AS BASIN INLET. EXISTING DRIVEWAY. RINCON HEIGHTS COMMUNITY GARDEN
Contractors:
- CUSTOM SAW CUTS
- LIL JOHN'S EXCAVATING
Outstanding Activity Conditions
Permit Number - T14EX01186
Permit Status: Closed
Permit Description: CURB CORES ANS STREET SIDE STORMWATER HARVESTING BASINS PER TDOT STANDARD DETAILS & SPECS. PROPOSED BASIN LAYOUT, CURB INLET LOCATIONS AND TREE LOCATIONS ARE FOUND IN THE DRAWINGS. 1'MIN. SETBACK FROM SIDEWALK; BOTTOM OF BASIN-ELEV-0.67'-BOTTOM OF CURB ELEV.0.0'-TWO (2) X4" CURB CORES PER BASIN 8" MIN SPACING. CORES PER COT STANDARD DETAIL. 2" MIN SETBACK FROM CURB, TYPICAL. EXISTING FLUSH CURB TO BE USED AS BASIN INLET. EXISTING DRIVEWAY.
RINCON HEIGHTS COMMUNITY GARDEN
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
11/12/2014 | ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS. |
11/12/2014 | EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE. |
11/12/2014 | PAVEMENT PATCHES SHALL BE IN ACCORDANCE TO PC/COT STANDARD DETAIL 216. TYPE "B" PATCHES (CONCRETE SUB-BASE) ARE REQUIRED FOR ALL STREETS SHOWN ON THE CITY'S MAJOR STREETS AND ROUTES PLAN AND ALL INVERTED WATER CARRYING STREETS, SEE INSPECTOR FOR DETAILS. |
11/12/2014 | ANY DAMAGE TO PUBLIC OR PRIVATE PROPERTY AS A RESULT OF CONTRACTOR'S OPERATIONS SHALL BE RESTORED IN KIND BY CONTRACTOR AT NO COST TO THE CITY. |
11/12/2014 | ALL WORK CONDUCTED WITHOUT OBTAINING THE PROPER INSPECTIONS, OR PRIOR APPROVALS, FROM THE TDOT CONSTRUCTION INSPECTION, SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT NO COST TO THE CITY. |