Permit Details

Status:
Closed
Type:
RIGHT OF WAY IMPROVMENTS
Address:
1001 E 9TH ST
Apply Date:
08/27/2014
Applicant:
JESSE GRINSTEINER
Description:
EMERGENCY REPAIR-REMOVE APPROXIMATELY 6LF OF SIDEWALK, EXCAVATE TO REPAIR BROKEN SEWER SERVICE. BACKFILL AND REPLACE SIDEWALK WHEN COMPLETE.
Contractors:
  • K E & G CONSTRUCTION ***APA***

Outstanding Activity Conditions

Permit Number - T14EX00968
Permit Status: Closed
Permit Description: EMERGENCY REPAIR-REMOVE APPROXIMATELY 6LF OF SIDEWALK, EXCAVATE TO REPAIR BROKEN SEWER SERVICE. BACKFILL AND REPLACE SIDEWALK WHEN COMPLETE.
Total Outstanding Activity Conditions - 6
Date Name
08/27/2014 ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS.
08/27/2014 EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE.
08/27/2014 PRIOR TO COMMENCEMENT OF WORK, PLEASE CALL CITY OF TUCSON DOT INSPECTOR CHRIS MCNELLIS AT 520-403-2408 TO ARRANGE FOR A PRE-CONSTRUCTION MEETING.
08/27/2014 PAVEMENT PATCHES SHALL BE IN ACCORDANCE TO PC/COT STANDARD DETAIL 216. TYPE "B" PATCHES (CONCRETE SUB-BASE) ARE REQUIRED FOR ALL STREETS SHOWN ON THE CITY'S MAJOR STREETS AND ROUTES PLAN AND ALL INVERTED WATER CARRYING STREETS, SEE INSPECTOR FOR DETAILS.
08/27/2014 ANY DAMAGE TO PUBLIC OR PRIVATE PROPERTY AS A RESULT OF CONTRACTOR'S OPERATIONS SHALL BE RESTORED IN KIND BY CONTRACTOR AT NO COST TO THE CITY.
08/27/2014 ALL WORK CONDUCTED WITHOUT OBTAINING THE PROPER INSPECTIONS, OR PRIOR APPROVALS, FROM THE TDOT CONSTRUCTION INSPECTION, SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT NO COST TO THE CITY.