Permit Details

Status:
Closed
Type:
RIGHT OF WAY IMPROVMENTS
Address:
5310 E GRANT RD
Apply Date:
08/11/2014
Applicant:
RICARDO YANEZ SR
Description:
DIRT TRENCH 83' TRENCH/BORE ASPHALT DRIVEWAY 25', PLACE 2" PVC CONDUIT FOR ZAYO FIBER
Contractors:
  • BETTER WAY CONTRACTING LLC **APA **

Outstanding Activity Conditions

Permit Number - T14EX00883
Permit Status: Closed
Permit Description: DIRT TRENCH 83' TRENCH/BORE ASPHALT DRIVEWAY 25', PLACE 2" PVC CONDUIT FOR ZAYO FIBER
Total Outstanding Activity Conditions - 6
Date Name
08/11/2014 ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS.
08/11/2014 EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE.
08/11/2014 PAVEMENT PATCHES SHALL BE IN ACCORDANCE TO PC/COT STANDARD DETAIL 216. TYPE "B" PATCHES (CONCRETE SUB-BASE) ARE REQUIRED FOR ALL STREETS SHOWN ON THE CITY'S MAJOR STREETS AND ROUTES PLAN AND ALL INVERTED WATER CARRYING STREETS, SEE INSPECTOR FOR DETAILS.
08/11/2014 ANY DAMAGE TO PUBLIC OR PRIVATE PROPERTY AS A RESULT OF CONTRACTOR'S OPERATIONS SHALL BE RESTORED IN KIND BY CONTRACTOR AT NO COST TO THE CITY.
08/11/2014 ALL WORK CONDUCTED WITHOUT OBTAINING THE PROPER INSPECTIONS, OR PRIOR APPROVALS, FROM THE TDOT CONSTRUCTION INSPECTION, SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT NO COST TO THE CITY.
08/11/2014 PRIOR TO COMMENCEMENT OF WORK, PLEASE CALL CITY OF TUCSON DOT INSPECTOR RIK HNAT AT 520-260-1875 TO ARRANGE FOR PRE-CONSTRUCTION MEETING.