Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T14EX00882
Permit Details
Apply Date:
08/11/2014
Applicant:
RICARDO YANEZ SR
Description:
DIRT TRENCH 100', PLACE 2" PVC CONDUIT FOR TW TELECOM; BACK OF SIDEWALK
Contractors:
- BETTER WAY CONTRACTING LLC **APA **
Outstanding Activity Conditions
Permit Number - T14EX00882
Permit Status: Closed
Permit Description: DIRT TRENCH 100', PLACE 2" PVC CONDUIT FOR TW TELECOM;
BACK OF SIDEWALK
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
08/11/2014 | ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS. |
08/11/2014 | EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE. |
08/11/2014 | PAVEMENT PATCHES SHALL BE IN ACCORDANCE TO PC/COT STANDARD DETAIL 216. TYPE "B" PATCHES (CONCRETE SUB-BASE) ARE REQUIRED FOR ALL STREETS SHOWN ON THE CITY'S MAJOR STREETS AND ROUTES PLAN AND ALL INVERTED WATER CARRYING STREETS, SEE INSPECTOR FOR DETAILS. |
08/11/2014 | ANY DAMAGE TO PUBLIC OR PRIVATE PROPERTY AS A RESULT OF CONTRACTOR'S OPERATIONS SHALL BE RESTORED IN KIND BY CONTRACTOR AT NO COST TO THE CITY. |
08/11/2014 | ALL WORK CONDUCTED WITHOUT OBTAINING THE PROPER INSPECTIONS, OR PRIOR APPROVALS, FROM THE TDOT CONSTRUCTION INSPECTION, SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT NO COST TO THE CITY. |
08/11/2014 | PRIOR TO COMMENCEMENT OF WORK, PLEASE CALL CITY OF TUCSON DOT INSPECTOR TOM WOLGANG AT 520-400-7064 TO ARRANGE FOR PRE-CONSTRUCTION MEETING. |