Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T14EX00720
Permit Details
Apply Date:
06/16/2014
Applicant:
SOUTHWEST GAS B*
Description:
Trenching Or Boring 10554' In Dirt, 160' In Pavement Along Streets, Alleys And In Alleys, Within Bilby Rd, Calle Garcia, Calle Margarita, Calle Antonia, Santa Maria, 12th Ave To Missiondale Ave, San Fernando Ave From Santa Maria To Bilby
Contractors:
- ARIZONA PIPE LINE COMPANY ,
Outstanding Activity Conditions
Permit Number - T14EX00720
Permit Status: Final
Permit Description: Trenching Or Boring 10554' In Dirt, 160' In Pavement Along Streets, Alleys And In Alleys, Within Bilby Rd, Calle Garcia, Calle Margarita, Calle Antonia, Santa Maria, 12th Ave To Missiondale Ave, San Fernando Ave From Santa Maria To Bilby
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
06/16/2014 | ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS. |
06/16/2014 | EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE. |
06/16/2014 | PRIOR TO COMMENCEMENT OF WORK, PLEASE CALL CITY OF TUCSON DOT INSPECTOR CHRIS MCNELLIS AT 520-403-2408 TO ARRANGE FOR A PRE-CONSTRUCTION MEETING. |
06/16/2014 | ANY DAMAGE TO PUBLIC OR PRIVATE PROPERTY AS A RESULT OF CONTRACTOR'S OPERATIONS SHALL BE RESTORED IN KIND BY CONTRACTOR AT NO COST TO THE CITY. |
06/16/2014 | **Storm drains are located along 12th Ave. Please work with the area inspector accordingly. Any damages to the City storm drain system shall be repaired/replaced at no cost to the City.** |
Completed Inspections
Permit Status: Final
Permit Number: T14EX00720
Permit Description: Trenching Or Boring 10554' In Dirt, 160' In Pavement Along Streets, Alleys And In Alleys, Within Bilby Rd, Calle Garcia, Calle Margarita, Calle Antonia, Santa Maria, 12th Ave To Missiondale Ave, San Fernando Ave From Santa Maria To Bilby
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/15/2014 | TDOT-EXCAV GENERAL INSPECTION | JCastro | Approved | 7/15/14-Bore work in dirt alley,pavement has been completed.Perm-patch work done. |