Permit Details

Status:
Closed
Type:
RIGHT OF WAY IMPROVMENTS
Address:
115 N 3RD AV
Apply Date:
05/15/2014
Applicant:
AUDREY ALVAREZ
Description:
WATER LINE SETTLEMENT REPAIR, NO DIRT, NO SIDEWALK, & 250 SQUARE FEET OF ASPHALT.
Contractors:
  • TRICON CONTRACTING INC *APA*

Outstanding Activity Conditions

Permit Number - T14EX00590
Permit Status: Closed
Permit Description: WATER LINE SETTLEMENT REPAIR, NO DIRT, NO SIDEWALK, & 250 SQUARE FEET OF ASPHALT.
Total Outstanding Activity Conditions - 4
Date Name
05/15/2014 ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS.
05/15/2014 EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE.
05/15/2014 PRIOR TO COMMENCEMENT OF WORK, PLEASE CALL CITY OF TUCSON DOT INSPECTOR CHRIS MCNELLIS AT 520-403-2408 TO ARRANGE FOR A PRE-CONSTRUCTION MEETING.
05/15/2014 ANY DAMAGE TO PUBLIC OR PRIVATE PROPERTY AS A RESULT OF CONTRACTOR'S OPERATIONS SHALL BE RESTORED IN KIND BY CONTRACTOR AT NO COST TO THE CITY.