Permit Details

Status:
Closed
Type:
RIGHT OF WAY IMPROVMENTS
Apply Date:
04/30/2014
Applicant:
BILL CHRISWELL
Description:
Excavation, backfill and all surface repairs shall be per COT Standard Details and Standard Specifications for Public Improvements. Attaching raised planters to sidewalk to define/contain seating area per TRE 2013-026 and approved development plan DP14-0039. Contractor is responsible for ensuring that the planters do not encroach outside the TRE limits shown in exhibits "A" & "B"___ Contractor must coordinate work with Sun Link.
Contractors:
  • CUTSHAW CONSTRUCTION INC ,

Outstanding Activity Conditions

Permit Number - T14EX00454
Permit Status: Closed
Permit Description: Excavation, backfill and all surface repairs shall be per COT Standard Details and Standard Specifications for Public Improvements. Attaching raised planters to sidewalk to define/contain seating area per TRE 2013-026 and approved development plan DP14-0039. Contractor is responsible for ensuring that the planters do not encroach outside the TRE limits shown in exhibits "A" & "B"___ Contractor must coordinate work with Sun Link.
Total Outstanding Activity Conditions - 4
Date Name
04/30/2014 ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS.
04/30/2014 EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE.
04/30/2014 PRIOR TO COMMENCEMENT OF WORK, PLEASE CALL CITY OF TUCSON DOT INSPECTOR CHRIS MCNELLIS AT 520-403-2408 TO ARRANGE FOR A PRE-CONSTRUCTION MEETING.
04/30/2014 ANY DAMAGE TO PUBLIC OR PRIVATE PROPERTY AS A RESULT OF CONTRACTOR'S OPERATIONS SHALL BE RESTORED IN KIND BY CONTRACTOR AT NO COST TO THE CITY.