Permit Details

Status:
Closed
Type:
RIGHT OF WAY IMPROVMENTS
Apply Date:
02/12/2014
Applicant:
METRO TUCSON EXPEDITING & DEVELOPMENT
Description:
1) TRENCHING +/- 1082'LF TO PLACE TEP FACILITIES ASSOCIATED WITH DP12-0186. TRENCHING WILL BE WITHIN 1ST ST, TYNDALL AV AND ALLEY BEHIND ADDRESS, INCLUDING THE PLACEMENT OF TWO TEP PULL BOXES WITH MANHOLES, ONE WILL BE IIN 1ST ST AND ONE IN TYDALL AV. 2) REMOVAL OF A SECTION OF CURB ALONG TNYDALL AVE FRONTAGE IN PREPARATION OF OFFSITE IMPROVEMENTS. **CAUTION STORM DRAINS IN THE AREA.**
Contractors:
  • URBAN EDGE CUSTOM DEVELOPMENT INC

Outstanding Activity Conditions

Permit Number - T14EX00107
Permit Status: Closed
Permit Description: 1) TRENCHING +/- 1082'LF TO PLACE TEP FACILITIES ASSOCIATED WITH DP12-0186. TRENCHING WILL BE WITHIN 1ST ST, TYNDALL AV AND ALLEY BEHIND ADDRESS, INCLUDING THE PLACEMENT OF TWO TEP PULL BOXES WITH MANHOLES, ONE WILL BE IIN 1ST ST AND ONE IN TYDALL AV. 2) REMOVAL OF A SECTION OF CURB ALONG TNYDALL AVE FRONTAGE IN PREPARATION OF OFFSITE IMPROVEMENTS. **CAUTION STORM DRAINS IN THE AREA.**
Total Outstanding Activity Conditions - 3
Date Name
02/12/2014 ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS.
02/12/2014 EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE.
02/12/2014 PRIOR TO COMMENCEMENT OF WORK, PLEASE CALL CITY OF TUCSON DOT INSPECTOR CHRIS MCNELLIS AT 520-403-2408 TO ARRANGE FOR A PRE-CONSTRUCTION MEETING.