Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
C of o
Type:
COMMERCIAL ALTERATION
Apply Date:
10/10/2014
Applicant:
JOHANSEN INTERIORS LLC
Description:
RETAIL
Contractors:
  • JOHANSEN INTERIORS LLC

Permit Reviews

Permit Number - T14CM06821
Permit Status: C of o
Permit Description: RETAIL
Start Date Submittal Complete Date Status  
10/10/2014 PLANS OK TO SUBMIT - COMM 11/04/2014 COMPLETED Review Details
11/04/2014 COMMERCIAL - TI 11/04/2014 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T14CM06821
Permit Status: C of o
Permit Description: RETAIL
Total Outstanding Activity Conditions - 1
Date Name
10/10/2014 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T14CM06821
Permit Description: RETAIL
Total Completed Inspections - 18
Date Description Inspector Results Comments
11/12/2014 ELECTRIC - INTERMEDIATE MRAMBER Approved 1. ELEC. U.G. OK TO COVER
11/12/2014 ELECTRIC - INTERMEDIATE MRAMBER Approved IVRS - Inspection :*
11/12/2014 SHEET ROCK NAILING MRAMBER Approved IVRS - Inspection :*
11/12/2014 FRAMING MRAMBER Approved IVRS - Inspection :*
11/13/2014 RIGHT OF WAY - FINAL JC Approved
11/13/2014 RIGHT OF WAY - FINAL RLEDONNE Approved
11/13/2014 SIGN - FINAL RLEDONNE Approved
11/13/2014 LANDSCAPE - FINAL RLEDONNE Approved
11/13/2014 ENGINEERING - FINAL RLEDONNE Approved
11/14/2014 NPPO - FINAL RDLD Approved
12/11/2014 BUILDING - FINAL AROMERO Approved FIRE FINAL APPROVED AND PERFORMED
12/11/2014 BUILDING - FINAL MRAMBER Approved IVRS - Inspection :* pending fire final
12/11/2014 FIRE SPKLR - FINAL CSCHULTZ Approved 2nd inspection 3:00 PM contractor called me back stating all done, check e-mails and I did received sprinkler report from the landlord, back up lights were replace due to bad circuit boards and now work and 4'x4' closet spaces plywood on by wood glue and screwed on and then caulked in place.
12/11/2014 FIRE - FINAL CSCHULTZ Approved 2nd inspection 3:00 PM contractor called me back stating all done, check e-mails and I did received sprinkler report from the landlord, back up lights were replace due to bad circuit boards and now work and 4'x4' closet spaces plywood on by wood glue and screwed on and then caulked in place.
12/11/2014 FIRE SPKLR - FINAL CSCHULTZ Approved Temp C od O okay
1st inspection at 11:00AM Not approve due to no annual fire sprinkler or 5 year check valve inspections done for over 6 years
Need to add sprinkler coverage in the 4'x4' closet space were storage is located in both storage rooms or clean out space of all combustibles and completely plywood off area so as no one can use the space.
12/11/2014 FIRE - FINAL CSCHULTZ Approved Temp C od O okay
1st inspection at 11:00AM Not approve due to no annual fire sprinkler or 5 year check valve inspections done for over 6 years
Need to add sprinkler coverage in the 4'x4' closet space were storage is located in both storage rooms or clean out space of all combustibles and completely plywood off area so as no one can use the space.
When testing battery backup lights three failed to work (1) over main entrance (1) on the south wall and (1) over the rear exit (east wall). Contractor try hooking up the batteries and then turn the power back on and the backup lights came on when he turned off the power the lights turn off.
Check the rear exit door there was a 3'x3' pad but big rocks (approx. 3 to 4 inches in size) for landscaping was pile around the pad make access to public way a hazard, called and talked to DSC building inspector and he stated that was okay as long as they have a 3' x 3' pad (DSC inspector I called was the one for today).
12/11/2014 ELECTRIC - FINAL MRAMBER Approved IVRS - Inspection :*
06/16/2015 ELECTRIC - ABOVE CEILING AROMERO Approved PER BUILDING FINAL

Documents

File Name Document Type  
None CERT OF OCC VIEW
001_GI001.TIF CONSTRPLANS VIEW
002_GI002.TIF CONSTRPLANS VIEW
003_GI003.TIF CONSTRPLANS VIEW
004_AE001.TIF CONSTRPLANS VIEW
005_AE002.TIF CONSTRPLANS VIEW
006_AE101.TIF CONSTRPLANS VIEW
007_AE102.TIF CONSTRPLANS VIEW
008_AE401.TIF CONSTRPLANS VIEW
009_E-1.00.TIF CONSTRPLANS VIEW
010_E-2.00.TIF CONSTRPLANS VIEW
011_E-3.00.TIF CONSTRPLANS VIEW
None DOCUMENTS VIEW