Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T13EX01288
Permit Details
Apply Date:
12/02/2013
Applicant:
PULTE HOME CORP AZ *APA*
Description:
18' OF DRIVEWAY AND 48' OF CITY SIDEWALK
Contractors:
- SOUTHWEST CONCRETE INC
Outstanding Activity Conditions
Permit Number - T13EX01288
Permit Status: Void
Permit Description: 18' OF DRIVEWAY AND 48' OF CITY SIDEWALK
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
12/02/2013 | A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 2. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season. TDOT Engineering will grant an exception for documented emergency work or on-going construction work. Night work is approved for this project from 10 P.M. to 6 A.M. until January 2. |
12/02/2013 | Permittee acknowledges and agrees that the City makes no representations or warranties that the roadway and/or other City property ("Property") that is the subject of this Permit is fit or suitable for the purpose of the El Tour event(s); and that Permittee takes and uses the property under this Permit "AS IS" with any latent and patent defects, including but not limited to any defects in the roadway that will be used as part of the event(s). Permittee acknowledges that it is not relying upon any representation, statement or other assertion with respect to the condition of the Property or its suitability for the Permittee's intended use, but is relying on Permittee's own examination and inspection of the Property, including its examination and testing of the roadway and any of the other conditions that may be a hazard to cyclists, spectators, and any other person who may participate in the event(s). |
12/02/2013 | ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS. |
12/02/2013 | EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE. |