Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Closed
Type:
SIDEWALK INSTALLATION
Apply Date:
11/26/2013
Applicant:
N/A
Description:
EXCAVATE TO INSTALL 18'OF DRIVEWAY AND50'OF CITY SIDEWALK
Contractors:
  • PULTE HOME CORP AZ *APA*

Outstanding Activity Conditions

Permit Number - T13EX01270
Permit Status: Closed
Permit Description: EXCAVATE TO INSTALL 18'OF DRIVEWAY AND50'OF CITY SIDEWALK
Total Outstanding Activity Conditions - 4
Date Name
11/26/2013 A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 2. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season. TDOT Engineering will grant an exception for documented emergency work or on-going construction work. Night work is approved for this project from 10 P.M. to 6 A.M. until January 2.
11/26/2013 Permittee acknowledges and agrees that the City makes no representations or warranties that the roadway and/or other City property ("Property") that is the subject of this Permit is fit or suitable for the purpose of the El Tour event(s); and that Permittee takes and uses the property under this Permit "AS IS" with any latent and patent defects, including but not limited to any defects in the roadway that will be used as part of the event(s). Permittee acknowledges that it is not relying upon any representation, statement or other assertion with respect to the condition of the Property or its suitability for the Permittee's intended use, but is relying on Permittee's own examination and inspection of the Property, including its examination and testing of the roadway and any of the other conditions that may be a hazard to cyclists, spectators, and any other person who may participate in the event(s).
11/26/2013 EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE.
11/26/2013 CALL JAMES CASTRO @ 400-6609 PRIOR TO START OF WORK FOR A FIELD MEETING W/PERMITS AND CODES INSPECTOR. ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS.