Permit: T13EX00911
Permit Details
Apply Date:
07/22/2013
Applicant:
DVP PROFESSIONAL BUILDERS
Description:
80LF SEWER/HCS CONNECTION ALONG PARK AVE. INSTALL 35'LF DRIVEWAY ENTRYWAY ON PARK AV. ALONG WITH TWO 25'R CURB RETURNS WITH 3 HANDICAP RAMPS W/TRUNCATED DOME TO BE ADA COMPLIANT. 195LF X 6' WIDE SIDEWALK. CLOSE EXISTING 30'LF CURB OPENING ON 22ND ST. INSTALL 80'LF TOTAL OF WATER, SEWER, AND IRRAGATION LINES TO PROPERTY LINE.
Contractors:
- DVP PROFESSIONAL BUILDERS
Outstanding Activity Conditions
Permit Number - T13EX00911
Permit Status: Closed
Permit Description: 80LF SEWER/HCS CONNECTION ALONG PARK AVE.
INSTALL 35'LF DRIVEWAY ENTRYWAY ON PARK AV. ALONG WITH TWO 25'R CURB RETURNS WITH 3 HANDICAP RAMPS W/TRUNCATED DOME TO BE ADA COMPLIANT. 195LF X 6' WIDE SIDEWALK. CLOSE EXISTING 30'LF CURB OPENING ON 22ND ST. INSTALL 80'LF TOTAL OF WATER, SEWER, AND IRRAGATION LINES TO PROPERTY LINE.
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
07/22/2013 | EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE. |
10/09/2013 | CALL TOM 400-7395 PRIOR TO START OF WORK FOR A FIELD MEETING W/PERMITS AND CODES INSPECTOR. ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS. |