Permit Details

Status:
Closed
Type:
RIGHT OF WAY IMPROVMENTS
Address:
1 E BROADWAY BL
Address NEW:
1 E BROADWAY BL
Apply Date:
06/12/2013
Applicant:
ROBERT CAYLOR
Description:
24LF CURB CUT FOR DRIVEWAY APRON STD DTL 206 ON STONE AVE AND 315LF OF SIDEWALK ON STONE AVE AND BROADWAY BLVD. INSTALL TREE WELLS AND DRAINAGE SCUPPERS WITHIN SIDEWALK. **STORM DRAINS IN THE AREA. PLEASE WORK WITH THE AREA INSPECTOR ACCORDINGLY. ANY DAMAGES TO THE CITY STORM DRAIN SYSTEM SHALL BE REPAIRED/REPLACED AT NO COST TO THE CITY.** **THIS PROJECT IS LOCATED IN AN ARCHAEOLOGICAL SENSITIVITY ZONE. AN ARCHAEOLOGICAL MONITOR HIRED BY THE PERMIT APPLICANT IS REQUIRED TO BE ON SITE DURING ANY DIGGING, UNLESS A WAIVER IS ISSUED. MONITORING REPORTS ARE TO BE SUBMITTED TO JONATHAN MABRY, HISTORIC PRESERVATION OFFICE, CITY OF TUCSON, P.O. BOX 27210, TUCSON, AZ 85726.** CONTACT JONATHAN MABRY, 837-6968 OR JONATHAN.MABRY@TUCSONAZ.GOV WITH ANY QUESTIONS.

Outstanding Activity Conditions

Permit Number - T13EX00820
Permit Status: Closed
Permit Description: 24LF CURB CUT FOR DRIVEWAY APRON STD DTL 206 ON STONE AVE AND 315LF OF SIDEWALK ON STONE AVE AND BROADWAY BLVD. INSTALL TREE WELLS AND DRAINAGE SCUPPERS WITHIN SIDEWALK. **STORM DRAINS IN THE AREA. PLEASE WORK WITH THE AREA INSPECTOR ACCORDINGLY. ANY DAMAGES TO THE CITY STORM DRAIN SYSTEM SHALL BE REPAIRED/REPLACED AT NO COST TO THE CITY.** **THIS PROJECT IS LOCATED IN AN ARCHAEOLOGICAL SENSITIVITY ZONE. AN ARCHAEOLOGICAL MONITOR HIRED BY THE PERMIT APPLICANT IS REQUIRED TO BE ON SITE DURING ANY DIGGING, UNLESS A WAIVER IS ISSUED. MONITORING REPORTS ARE TO BE SUBMITTED TO JONATHAN MABRY, HISTORIC PRESERVATION OFFICE, CITY OF TUCSON, P.O. BOX 27210, TUCSON, AZ 85726.** CONTACT JONATHAN MABRY, 837-6968 OR JONATHAN.MABRY@TUCSONAZ.GOV WITH ANY QUESTIONS.
Total Outstanding Activity Conditions - 2
Date Name
06/12/2013 ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS.
06/12/2013 EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE.