Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Closed
Type:
RIGHT OF WAY IMPROVMENTS
Address:
1 E BROADWAY BL
Apply Date:
06/12/2013
Applicant:
ROBERT CAYLOR
Description:
24LF CURB CUT FOR DRIVEWAY APRON STD DTL 206 ON STONE AVE AND 315LF OF SIDEWALK ON STONE AVE AND BROADWAY BLVD. INSTALL TREE WELLS AND DRAINAGE SCUPPERS WITHIN SIDEWALK. **STORM DRAINS IN THE AREA. PLEASE WORK WITH THE AREA INSPECTOR ACCORDINGLY. ANY DAMAGES TO THE CITY STORM DRAIN SYSTEM SHALL BE REPAIRED/REPLACED AT NO COST TO THE CITY.** **THIS PROJECT IS LOCATED IN AN ARCHAEOLOGICAL SENSITIVITY ZONE. AN ARCHAEOLOGICAL MONITOR HIRED BY THE PERMIT APPLICANT IS REQUIRED TO BE ON SITE DURING ANY DIGGING, UNLESS A WAIVER IS ISSUED. MONITORING REPORTS ARE TO BE SUBMITTED TO JONATHAN MABRY, HISTORIC PRESERVATION OFFICE, CITY OF TUCSON, P.O. BOX 27210, TUCSON, AZ 85726.** CONTACT JONATHAN MABRY, 837-6968 OR JONATHAN.MABRY@TUCSONAZ.GOV WITH ANY QUESTIONS.

Outstanding Activity Conditions

Permit Number - T13EX00820
Permit Status: Closed
Permit Description: 24LF CURB CUT FOR DRIVEWAY APRON STD DTL 206 ON STONE AVE AND 315LF OF SIDEWALK ON STONE AVE AND BROADWAY BLVD. INSTALL TREE WELLS AND DRAINAGE SCUPPERS WITHIN SIDEWALK. **STORM DRAINS IN THE AREA. PLEASE WORK WITH THE AREA INSPECTOR ACCORDINGLY. ANY DAMAGES TO THE CITY STORM DRAIN SYSTEM SHALL BE REPAIRED/REPLACED AT NO COST TO THE CITY.** **THIS PROJECT IS LOCATED IN AN ARCHAEOLOGICAL SENSITIVITY ZONE. AN ARCHAEOLOGICAL MONITOR HIRED BY THE PERMIT APPLICANT IS REQUIRED TO BE ON SITE DURING ANY DIGGING, UNLESS A WAIVER IS ISSUED. MONITORING REPORTS ARE TO BE SUBMITTED TO JONATHAN MABRY, HISTORIC PRESERVATION OFFICE, CITY OF TUCSON, P.O. BOX 27210, TUCSON, AZ 85726.** CONTACT JONATHAN MABRY, 837-6968 OR JONATHAN.MABRY@TUCSONAZ.GOV WITH ANY QUESTIONS.
Total Outstanding Activity Conditions - 2
Date Name
06/12/2013 ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS.
06/12/2013 EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE.

Documents

File Name Document Type  
None DOCUMENTS VIEW