Permit: T13EX00442
Permit Details
Apply Date:
03/20/2013
Applicant:
BETTER WAY CONTRACTING LLC **APA **
Description:
TRENCH AND BORE 162' LF in ASPHALT ON GRANADA REMOVE AND REPLACE 4X4 CONCRETE TO PLACE 2" PVC CONDUIT FOR TIME WARNER. *** THIS PROJECT IS LOCATED IN AN ARCHEOLOGICAL SENSITIVITY ZONE. AN ARCHEOLOGICAL MONITOR HIRED BY THE PERMIT APPLICANT IS REQUIRED TO BE ON SITE DURING ANY DIGGING, UNLESS A WAIVER IS ISSUED. MONITERING REPORTS ARE TO BE SUBMITTED TO JONATHAN MABRY. ***
Contractors:
- BETTER WAY CONTRACTING LLC **APA **
Outstanding Activity Conditions
Permit Number - T13EX00442
Permit Status: Closed
Permit Description: TRENCH AND BORE 162' LF in ASPHALT ON GRANADA REMOVE AND REPLACE 4X4 CONCRETE TO PLACE 2" PVC CONDUIT FOR TIME WARNER. *** THIS PROJECT IS LOCATED IN AN ARCHEOLOGICAL SENSITIVITY ZONE. AN ARCHEOLOGICAL MONITOR HIRED BY THE PERMIT APPLICANT IS REQUIRED TO BE ON SITE DURING ANY DIGGING, UNLESS A WAIVER IS ISSUED. MONITERING REPORTS ARE TO BE SUBMITTED TO JONATHAN MABRY. ***
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
03/20/2013 | ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS. |
03/20/2013 | EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE. |