Permit: T13EX00328
Permit Details
Apply Date:
03/01/2013
Applicant:
BETTER WAY CONTRACTING LLC **APA **
Description:
10 LF DIRT TRENCH UNDER EXISTING TIME WARNER VAULT TO GAIN ACCESS TO BASEMENT FOR FIBER PLACEMENT ON CHURCH ST. **STORM WATER DRAINS IN AREA. PLEASE WORK WITH THE AREA INSPECTOR ACOORDINGLY. ANY DAMAGES TO THE CITY STORM DRAIN SYSTEM SHALL BE REPAIRED/REPLACED AT NO COST TO THE CITY.*** THIS PROJECT IS LOCATED IN AN ARCHAEOLGICAL SENSITIVITY ZONE. AN ARCHAEOLOGICAL MONITER HIRED BY THE PERMIT APPLICANT IS REQUIRED TO BE ON-SITE DURING ANY DIGGING, UNLESS A WAIVER IS ISSUED. MONITERING REPORTS ARE TO SUBMITTED TO JONATHON MABRY.
Contractors:
- BETTER WAY CONTRACTING LLC **APA **
Outstanding Activity Conditions
Permit Number - T13EX00328
Permit Status: Closed
Permit Description: 10 LF DIRT TRENCH UNDER EXISTING TIME WARNER VAULT TO GAIN ACCESS TO BASEMENT FOR FIBER PLACEMENT ON CHURCH ST. **STORM WATER DRAINS IN AREA. PLEASE WORK WITH THE AREA INSPECTOR ACOORDINGLY. ANY DAMAGES TO THE CITY STORM DRAIN SYSTEM SHALL BE REPAIRED/REPLACED AT NO COST TO THE CITY.*** THIS PROJECT IS LOCATED IN AN ARCHAEOLGICAL SENSITIVITY ZONE. AN ARCHAEOLOGICAL MONITER HIRED BY THE PERMIT APPLICANT IS REQUIRED TO BE ON-SITE DURING ANY DIGGING, UNLESS A WAIVER IS ISSUED. MONITERING REPORTS ARE TO SUBMITTED TO JONATHON MABRY.
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
03/01/2013 | ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS. |
03/01/2013 | EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE. |