Permit: T13EX00063
Permit Details
Apply Date:
01/16/2013
Applicant:
K E & G CONSTRUCTION ***APA***
Description:
REPLACE 40LF OF CHEMICAL FEED LINE FOR SEWER, 20; IN DIRT, 20' IN PAVEMENT AT MANHOLE 9910-20. **STORM DRAINS IN THE AREA. PLEASE WORK WITH THE AREA INSPECTOR ACCORDINGLY. ANY DAMAGES TO THE CITY STORM DRAIN SYSTEM SHALL BE REPAIRED/REPLACED AT NO COST TO THE CITY.** THIS PROJECT IS LOCATED IN AN ARCHAEOLOGICAL SENSITIVITY ZONE. AN ARCHAEOLOGICAL MONITER HIRED BY PERMIT APPLICANT IS REQUIRED TO BE ON-SITE DURING ANY DIGGING, UNLESS A WAIVER IS ISSUED. MONITERING REPORTS ARE SUBMITTED TO JONATHAN MABRY. (APA)
Contractors:
- K E & G CONSTRUCTION ***APA***
Outstanding Activity Conditions
Permit Number - T13EX00063
Permit Status: Closed
Permit Description: REPLACE 40LF OF CHEMICAL FEED LINE FOR SEWER, 20; IN DIRT, 20' IN PAVEMENT AT MANHOLE 9910-20. **STORM DRAINS IN THE AREA. PLEASE WORK WITH THE AREA INSPECTOR ACCORDINGLY. ANY DAMAGES TO THE CITY STORM DRAIN SYSTEM SHALL BE REPAIRED/REPLACED AT NO COST TO THE CITY.** THIS PROJECT IS LOCATED IN AN ARCHAEOLOGICAL SENSITIVITY ZONE. AN ARCHAEOLOGICAL MONITER HIRED BY PERMIT APPLICANT IS REQUIRED TO BE ON-SITE DURING ANY DIGGING, UNLESS A WAIVER IS ISSUED. MONITERING REPORTS ARE SUBMITTED TO JONATHAN MABRY. (APA)
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
01/16/2013 | ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS. |
01/16/2013 | EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE. |