Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
SINGLE FAMILY OTHER
Apply Date:
10/17/2012
Applicant:
ROLAND ESTRADA
Description:
T12CM06534:PORCH ADDITION

Permit Reviews

Permit Number - T12OT01457
Permit Status: Final
Permit Description: T12CM06534:PORCH ADDITION
Start Date Submittal Complete Date Status  
10/17/2012 PLANS OK TO SUBMIT - FLOODPLAIN 10/17/2012 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T12OT01457
Permit Status: Final
Permit Description: T12CM06534:PORCH ADDITION
Total Outstanding Activity Conditions - 1
Date Name
10/17/2012 October 17, 2012 (No elevation certificate required) The applicant is authorized to use a portion of the flood hazard area (FEMA Zone X, Panel 2304 L, City of Tucson Flood Hazard Area) in the City of Tucson on the property described as 1912 South Timberline Avenue for the purpose of constructing improvements to an existing residential building. The applicant agrees to comply with City of Tucson Floodplain and Erosion Hazard regulations, and is particularly bound by the conditions stated below. Violation of any of the conditions stated or referred to below, as determined by the City Engineer, shall be grounds for revocation of this permit. Responsibility for renewal of this permit, if necessary, is with the applicant. Issuance of this permit does not constitute a waiver of other requirements contained in the Tucson City Code, Land Use Code, or any other Federal, State, or local regulation. No use other than as permitted herein is allowed. Additional uses allowed under City of Tucson Floodplain and Erosion Hazard Regulations and Watercourse Amenities, Safety, and Habitat regulations require the issuance of an additional Floodplain Use Permit. The following conditions shall apply to this permit. 1. All work shall conform to the attached plans (T12CM06534) which are made part of this permit. 2. The construction cost of the improvements shall not exceed 50% of the total appraised/assessed value of the existing structure, not including the land. The estimated cost of the improvements is $7,752 based on the permit valuation. The value of the house is estimated to be $60,750 which is 65% of the Pima County Assessor's full cash value of $93,461. The improvements amount to 12.8% of the value of the existing structure. 3. The existing drainage patterns at the property lines shall not be obstructed or changed. 4. Except as approved by the City Engineer prior to the start of construction, development under this permit shall not obstruct, retard or divert the existing flow of floodwaters from or to adjacent properties. 5. This permit becomes invalid and is subject to additional floodplain review, if any required development permit (s') changes the configuration of the structure and or site development. 6. Any patio walls to be constructed will require a separate Floodplain Use Permit. This Floodplain Use Permit will be automatically revoked and becomes invalid if conditions set forth in this permit are not complied with.

Documents

File Name Document Type  
None DOCUMENTS VIEW