Permit: T12OT00075
Permit Details
Apply Date:
01/12/2012
Applicant:
BLUESTONE DESIGN AND CONSTRUCTION L L C
Description:
FLOODPLAIN USE PERMIT NEW:HCS:RES
Permit Reviews
Permit Number - T12OT00075
Permit Status: Expired
Permit Description: FLOODPLAIN USE PERMIT NEW:HCS:RES
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/12/2012 | PLANS OK TO SUBMIT - FLOODPLAIN | 01/12/2012 | COMPLETED |
| 01/12/2012 | FLOODPLAIN | 03/06/2012 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T12OT00075
Permit Status: Expired
Permit Description: FLOODPLAIN USE PERMIT NEW:HCS:RES
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 01/30/2012 | The following 11 conditions apply to permit T12OT00075: 1) For a PDSD Engineering Inspection, call IVR (740-6970), or contact PDSD Engineering at 837-4991, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html 2) If east or west walls are built, at-grade wall openings will be needed & inspected by PDSD Engineering. 3) Floodplain Use Permit & plans shall be kept in readily accessible location on site at all times. 4) No disturbance other than the area within the lot and as shown on the approved plans. 5) PDSD Engineering Inspections are required prior to final floodplain inspection. |
| 01/30/2012 | 6) From FEMA data derived from drainage report prepared by Carlson Engineering, BFE = 2360.03 NAVD88. Minimum FFE elevation = 2361.03. 7) Submit Elevation Certifications by a Land Surveyor registered in Arizona for the pad elevation (prior to pouring slab), and later for finished construction. PDSD Engineering has the preliminary elevation certificate filled out for the RLS to use, as needed. First elevation certificate must be submitted prior to pouring concrete slab to assure minimum height is achieved. Concrete slab may not be poured until PDSD Engineering accepts first elevation certificate. An additional El Cert is needed for finished construction. Assure the lowest elevation of the utility equipment to service the building is provided in C2e) and E4 on finished construction el cert. Notations should be added to clarify type of equipment and location. 8) Within 5 (five) days of issuance of this permit, and through completion of the project, notification must be posted and maintained in a conspicuous place on the job site stating "CONSTRUCTION PROCEEDING UNDER REQUIREMENTS OF CITY OF TUCSON FLOODPLAIN USE PERMIT # T12OT00075. FOR INFORMATION PLEASE CALL 791-5550." 9) Except as approved by the City Engineer prior to the start of construction, development under this permit shall not obstruct, retard or divert the existing flow of floodwaters from or to adjacent properties. 10) This permit becomes invalid and is subject to additional floodplain review, if any required development permit changes the configuration of the improvement, or, if there is any further disturbance within the floodplain other than that outlined in this application. This floodplain use permit may be subject to conditions or restrictions designed to reduce or mitigate the potential damage or hazard to life or property resulting from development within the regulatory floodplain, floodway or erosion hazard areas as determined by the project engineer and accepted by the City of Tucson and PCRFCD. 11) See also any associated building permits. |