Permit Details

Status:
Closed
Type:
STREET EXCAVATION
Apply Date:
11/29/2012
Applicant:
BETTER WAY CONTRACTING LLC **APA **
Description:
BORE 174LF ACROSS MISSION ROAD. DIRT TRENCH 240LF, 12LF ASPHALT CUT TO PLACE 2" PVC CONDUIT FOR TIME WARNER FIBER. ** STORM DRAINS IN THE AREA. PLEASE WORK WITH THE AREA INSPECTOR ACCORDINGLY. ANY DAMAGES TO THE CITY STORM DRAIN SYSTEM SHALL BE REPAIRED/REPLACED AT NO COST TO THE CITY.**
Contractors:
  • BETTER WAY CONTRACTING LLC **APA **

Outstanding Activity Conditions

Permit Number - T12EX00663
Permit Status: Closed
Permit Description: BORE 174LF ACROSS MISSION ROAD. DIRT TRENCH 240LF, 12LF ASPHALT CUT TO PLACE 2" PVC CONDUIT FOR TIME WARNER FIBER. ** STORM DRAINS IN THE AREA. PLEASE WORK WITH THE AREA INSPECTOR ACCORDINGLY. ANY DAMAGES TO THE CITY STORM DRAIN SYSTEM SHALL BE REPAIRED/REPLACED AT NO COST TO THE CITY.**
Total Outstanding Activity Conditions - 2
Date Name
11/29/2012 ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS.
11/29/2012 EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE.

Documents

File Name Document Type  
None DOCUMENTS VIEW