Permit Details

Status:
Closed
Type:
RIGHT OF WAY IMPROVMENTS
Apply Date:
02/07/2012
Applicant:
JEFF ZENAN
Description:
REMOVING 2 - 13' BY 24' SECTION OF CONCRETE LINING FO CHANNEL TO REMOVE CONTAMINATED SOIL FROM DIESEL SPILL PER COT ENVIRONMENTAL SERV. A SEPARATE PERMIT WILL BE REQUIRED FOR BACKFILLING AND THE REPLACEMENT OF THE CONCRETE LINING. APPLICANT MUST RETAIN THE SERVICES OF AN AZ REGISTERED CIVIL ENGINEER TO DESIGN A REPAIR. PROPOSED REPAIRS MUST BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL.
Contractors:
  • SOUTHWEST HAZARD CONTROL INC ,

Outstanding Activity Conditions

Permit Number - T12EX00048
Permit Status: Closed
Permit Description: REMOVING 2 - 13' BY 24' SECTION OF CONCRETE LINING FO CHANNEL TO REMOVE CONTAMINATED SOIL FROM DIESEL SPILL PER COT ENVIRONMENTAL SERV. A SEPARATE PERMIT WILL BE REQUIRED FOR BACKFILLING AND THE REPLACEMENT OF THE CONCRETE LINING. APPLICANT MUST RETAIN THE SERVICES OF AN AZ REGISTERED CIVIL ENGINEER TO DESIGN A REPAIR. PROPOSED REPAIRS MUST BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL.
Total Outstanding Activity Conditions - 2
Date Name
02/07/2012 ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS.
02/07/2012 EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE.