Permit Details

Status:
Closed
Type:
RIGHT OF WAY IMPROVMENTS
Address:
191 S PLUMER AV
Apply Date:
08/15/2011
Applicant:
C A DEVELOPMENT AND CONSTRUCTION L L C
Description:
TRENCHING +/- 60LF ACROSS PLUMER AV TO PLACE CONDUIT FOR NEW TEP SERVIC LINE. PLACE +/- 100LF OF 5' WIDE SIDWALK, CONTRUCT A 24' WIDE DRIVEWAY ENTRANCE WITH CURB RETURNS AND CURB ACCESS RAMPS. CLOSE ANY ABANDONED ENTRANCES WITH MATCHING EXISTING CURB. ALL PER APPROVED SITE PLAN T10BU01569
Contractors:
  • C A DEVELOPMENT AND CONSTRUCTION L L C

Outstanding Activity Conditions

Permit Number - T11EX00427
Permit Status: Closed
Permit Description: TRENCHING +/- 60LF ACROSS PLUMER AV TO PLACE CONDUIT FOR NEW TEP SERVIC LINE. PLACE +/- 100LF OF 5' WIDE SIDWALK, CONTRUCT A 24' WIDE DRIVEWAY ENTRANCE WITH CURB RETURNS AND CURB ACCESS RAMPS. CLOSE ANY ABANDONED ENTRANCES WITH MATCHING EXISTING CURB. ALL PER APPROVED SITE PLAN T10BU01569
Total Outstanding Activity Conditions - 2
Date Name
08/15/2011 ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS.
08/15/2011 EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE.