Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T11EX00202
Permit Details
Apply Date:
04/28/2011
Applicant:
CHRISTOPHER ROMERO
Description:
EXCV +/- 40LF TO PLACE NEW 4" HCS. TOOLE AV IS A UNDERA NO CUT PAVEMENT MORATORIUM. HOWEVER, NO ADDT PAVING WILL BE REQUIRED OTHER THAN A B PATCH MATCHING EXISTING PAVEMENT STRUCTURAL SECTION THICKNESS WITH FINAL SURFACE TREATMENT BEING 2" PAG #2 PER JIM GLOCK AND THAD HARVISON. ADDT, THIS PROJECT IS LOCATED IN AN ARCHAEOLOGICAL SENSITIVITY ZONE. AND ARCHAEOLOGICAL MONITOR HIRED BY THE PERMIT APPLICANT IS REQ TO BE ON SITE DURING ANY DIGGING, UNLESS A WAIVER IS ISSUED. MONITORING REPORTS ARE TO BE SUBMITTED TO JONATHAN MABRY, HISTORIC PRESERVATION OFFICE, CITY OF TUCSON. P.O. BOX 27210 TUCSON AZ 85726. CONTACT JONATHAN MABRY, 837-6968 OR JONATHAN.MABRY@TUCSON AZ.GOV WITH ANY QUESTIONS.
Contractors:
- ROMERO PLUMBING SERVICES LLC
Outstanding Activity Conditions
Permit Number - T11EX00202
Permit Status: Closed
Permit Description: EXCV +/- 40LF TO PLACE NEW 4" HCS. TOOLE AV IS A UNDERA NO CUT PAVEMENT MORATORIUM. HOWEVER, NO ADDT PAVING WILL BE REQUIRED OTHER THAN A B PATCH MATCHING EXISTING PAVEMENT STRUCTURAL SECTION THICKNESS WITH FINAL SURFACE TREATMENT BEING 2" PAG #2 PER JIM GLOCK AND THAD HARVISON. ADDT, THIS PROJECT IS LOCATED IN AN ARCHAEOLOGICAL SENSITIVITY ZONE. AND ARCHAEOLOGICAL MONITOR HIRED BY THE PERMIT APPLICANT IS REQ TO BE ON SITE DURING ANY DIGGING, UNLESS A WAIVER IS ISSUED. MONITORING REPORTS ARE TO BE SUBMITTED TO JONATHAN MABRY, HISTORIC PRESERVATION OFFICE, CITY OF TUCSON. P.O. BOX 27210 TUCSON AZ 85726. CONTACT JONATHAN MABRY, 837-6968 OR JONATHAN.MABRY@TUCSON AZ.GOV WITH ANY QUESTIONS.
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
04/28/2011 | ALL WORK SHALL CONFORM TO CITY OF TUCSON STANDARDS AND SPECIFICATIONS. |
04/28/2011 | EXCAVATION WORK SHALL START WITHIN 30 DAYS OF PERMIT ISSUE DATE. WORK SHALL BE COMPLETED WITHIN 60 DAYS OF PERMIT ISSUE DATE. |