Permit: T11CM03290
Permit Details
Apply Date:
10/18/2011
Applicant:
WATSON, JAMES RICHARD
Description:
REPAIR ROOF:STORM DAMAGE
Contractors:
- BETTERWAY SERVICES INC
Permit Reviews
Permit Number - T11CM03290
Permit Status: Final
Permit Description: REPAIR ROOF:STORM DAMAGE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/18/2011 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 10/18/2011 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T11CM03290
Permit Status: Final
Permit Description: REPAIR ROOF:STORM DAMAGE
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
10/18/2011 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T11CM03290
Permit Description: REPAIR ROOF:STORM DAMAGE
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/03/2011 | ROOF NAILING | RCAMACHO | Approved | IVRS - Inspection :* 1) BECAUSE OF THE REMOVAL OF CEILING FINISHES IN HALLWAY AND REMOVAL OF INTERIOR WALL ? PROVIDING ACCESS FOR HARD WIRED SMOKE ALARM CIRCUIT 2) INSTALL SMOKE ALARMS HARD WIRED IN ALL BEDROOMS AND HALLWAYS INTERCONNECTED CIRCUIT TO PANEL R.313.2.1 |
11/09/2011 | FRAMING | RCAMACHO | Approved | IVRS - Inspection :* 1) INSTALL MISSING 2 X 4 AT HALLWAY DROPPED CEILING OVERSPAN 2) OK TO SHEETROCK AND INSULATE |
11/22/2011 | SHEET ROCK NAILING | RCAMACHO | Approved | IVRS - Inspection :* |
12/22/2011 | BUILDING - FINAL | MHENSON | Approved | IVRS - Inspection :* |