Permit: T11CM03091
Permit Details
Apply Date:
09/27/2011
Applicant:
J W ADRAGNA
Description:
TI:COFFEE SHOP
Contractors:
- CATALINA CONTRACTING SERVICES L L C
Permit Reviews
Permit Number - T11CM03091
Permit Status: C of o
Permit Description: TI:COFFEE SHOP
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/27/2011 | COMMERCIAL - TI | 11/04/2011 | COMPLETED |
| 11/04/2011 | COMMERCIAL - TI | 11/04/2011 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T11CM03091
Permit Status: C of o
Permit Description: TI:COFFEE SHOP
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 09/27/2011 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T11CM03091
Permit Description: TI:COFFEE SHOP
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/17/2011 | PLUMBING - PRE SLAB | RMYERS | Approved | IVRS - Inspection :* |
| 11/17/2011 | PLUMBING - ROUGH, SOIL | RMYERS | Approved | IVRS - Inspection :* |
| 11/18/2011 | FRAMING | MHENSON | Approved | IVRS - Inspection :* 1) NEED BACKING FOR VERTICAL GRAB BAR |
| 11/18/2011 | FRAMING | LHANLY | Approved | IVRS - Inspection :* |
| 11/18/2011 | PLUMBING - INTERMEDIATE | LHANLY | Approved | IVRS - Inspection :* |
| 11/18/2011 | ELECTRIC - INTERMEDIATE | LHANLY | Approved | IVRS - Inspection :* |
| 11/18/2011 | PLUMBING - INTERMEDIATE | RRICH | Approved | IVRS - Inspection :* |
| 11/21/2011 | ELECTRIC - ABOVE CEILING | LHANLY | Approved | |
| 11/21/2011 | PLUMBING - FINAL | LHANLY | Approved | NEED TO CHECK DRAIN SUPPORTS IN BASEMENT AT FINAL |
| 11/21/2011 | PLUMBING - PROGRESS | LHANLY | Approved | |
| 11/21/2011 | PLUMBING - ABOVE CEILING | LHANLY | Approved | |
| 11/21/2011 | BUILDING ABOVE CEILING | LHANLY | Approved | |
| 11/21/2011 | PLUMBING - ABOVE CEILING | LHANLY | Approved | SUPPORT DRAIN PIPE |
| 11/21/2011 | BUILDING ABOVE CEILING | LHANLY | Approved | |
| 11/22/2011 | SHEET ROCK NAILING | LHANLY | Approved | IVRS - Inspection :* |
| 12/02/2011 | FIRE - FINAL | WMOTTO | Approved | 1.A SPRINKLER FINAL NEEDS TO BE CALLED IN BEFORE FIRE FINAL CAN BE DONE. THIS SPACE NEEDS A SPRINKLER CONTRACTOR TO MOVE SPRINKLER HEADS ON THE NORTH AND SOUTH WALL. HEADS ARE TOUCHING THE WALLS THEY NEED 4 INCHES OF CLEARENCE FROM WALLS. 2. EXIT SIGNS AND EMERGENCY LIGHTING NEED TO BE IN PLACE AND WORKING. 3. ALL DOORS AND HARDWARE NEED TO BE IN PLACE. |
| 12/07/2011 | ELECTRIC - FINAL | LHANLY | Approved | |
| 12/07/2011 | BUILDING - FINAL | LHANLY | Approved | WATER CLOSETS TO HAVE ELONGATED BOWLS, SPLIT FRONT TOILET SEATS AND FLUSH HANDLE TO BE ON OPEN SIDE OF ROOM. VERTICAL GRAB-BAR TO BE MOUNTED 39"-41" FROM REAR WALL AND 39" - 41" FROM FLOOR DOOR HARDWARE MUST AUTOMATICALLY UNLOCK WHEN LEVER IS TURNED. |
| 01/11/2012 | FIRE SPKLR - FINAL | WMOTTO | Approved | |
| 01/13/2012 | HEALTH DEPT - FINAL 724-7908 | NRAMIREZ | Approved |