Permit Details

Status:
C of o
Type:
COMMERCIAL ALTERATION
Address:
39 N 6TH AV
Address NEW:
39 N 6TH AV
Apply Date:
09/27/2011
Applicant:
J W ADRAGNA
Description:
TI:COFFEE SHOP
Contractors:
  • CATALINA CONTRACTING SERVICES L L C

Permit Reviews

Permit Number - T11CM03091
Permit Status: C of o
Permit Description: TI:COFFEE SHOP
Start Date Submittal Complete Date Status  
09/27/2011 COMMERCIAL - TI 11/04/2011 COMPLETED Review Details
11/04/2011 COMMERCIAL - TI 11/04/2011 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T11CM03091
Permit Status: C of o
Permit Description: TI:COFFEE SHOP
Total Outstanding Activity Conditions - 1
Date Name
09/27/2011 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T11CM03091
Permit Description: TI:COFFEE SHOP
Total Completed Inspections - 20
Date Description Inspector Results Comments
11/17/2011 PLUMBING - PRE SLAB RMYERS Approved IVRS - Inspection :*
11/17/2011 PLUMBING - ROUGH, SOIL RMYERS Approved IVRS - Inspection :*
11/18/2011 FRAMING MHENSON Approved IVRS - Inspection :*
1) NEED BACKING FOR VERTICAL GRAB BAR
11/18/2011 FRAMING LHANLY Approved IVRS - Inspection :*
11/18/2011 PLUMBING - INTERMEDIATE LHANLY Approved IVRS - Inspection :*
11/18/2011 ELECTRIC - INTERMEDIATE LHANLY Approved IVRS - Inspection :*
11/18/2011 PLUMBING - INTERMEDIATE RRICH Approved IVRS - Inspection :*
11/21/2011 ELECTRIC - ABOVE CEILING LHANLY Approved
11/21/2011 PLUMBING - FINAL LHANLY Approved NEED TO CHECK DRAIN SUPPORTS IN BASEMENT AT FINAL
11/21/2011 PLUMBING - PROGRESS LHANLY Approved
11/21/2011 PLUMBING - ABOVE CEILING LHANLY Approved
11/21/2011 BUILDING ABOVE CEILING LHANLY Approved
11/21/2011 PLUMBING - ABOVE CEILING LHANLY Approved SUPPORT DRAIN PIPE
11/21/2011 BUILDING ABOVE CEILING LHANLY Approved
11/22/2011 SHEET ROCK NAILING LHANLY Approved IVRS - Inspection :*
12/02/2011 FIRE - FINAL WMOTTO Approved 1.A SPRINKLER FINAL NEEDS TO BE CALLED IN BEFORE FIRE FINAL CAN BE DONE. THIS SPACE NEEDS A SPRINKLER CONTRACTOR TO MOVE SPRINKLER HEADS ON THE NORTH AND SOUTH WALL. HEADS ARE TOUCHING THE WALLS THEY NEED 4 INCHES OF CLEARENCE FROM WALLS.
2. EXIT SIGNS AND EMERGENCY LIGHTING NEED TO BE IN PLACE AND WORKING.
3. ALL DOORS AND HARDWARE NEED TO BE IN PLACE.
12/07/2011 ELECTRIC - FINAL LHANLY Approved
12/07/2011 BUILDING - FINAL LHANLY Approved WATER CLOSETS TO HAVE ELONGATED BOWLS, SPLIT FRONT TOILET SEATS AND FLUSH HANDLE TO BE ON OPEN SIDE OF ROOM.

VERTICAL GRAB-BAR TO BE MOUNTED 39"-41" FROM REAR WALL AND 39" - 41" FROM FLOOR

DOOR HARDWARE MUST AUTOMATICALLY UNLOCK WHEN LEVER IS TURNED.
01/11/2012 FIRE SPKLR - FINAL WMOTTO Approved
01/13/2012 HEALTH DEPT - FINAL 724-7908 NRAMIREZ Approved

Documents

File Name Document Type  
C OF O_01-13-2012.TIF CERT OF OCC VIEW
001_A-1.TIF CONSTRPLANS VIEW
002_A-2.TIF CONSTRPLANS VIEW
003_A-3.TIF CONSTRPLANS VIEW
004_A-4.TIF CONSTRPLANS VIEW
005_P-1.TIF CONSTRPLANS VIEW
006_E-1.TIF CONSTRPLANS VIEW
007_DA-1.TIF CONSTRPLANS VIEW
None DOCUMENTS VIEW